X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0755161309000

Well Details

Well ID: 0755161309000
Loading map...
Location: 00/09-13-075-16W5/0
Location Alias: 00/09-13-75-16 W5M
Location Alias 2: 00/09-13-075-16 W5/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 5
Range: 16
Section: 13
County/Municipality: Big Lakes County
Well Name: DAYLIGHT GROUARD 9-13-75-16
Operator Name: Whitecap Resources Inc.
License Number: 0167794
License Date: 1994-06-09
License Status: Suspension
Spud Date: 1994-08-03
Final Drill Date: 1994-08-14
Well Total Depth: 2215.00 m
Surface Hole Latitude: 55.499555
Surface Hole Longitude: -116.334742

For data sources see[1][2]

Well History

Date Event
1994-06-09 Obtained License
1994-08-05 Surface Casing Operation Performed
1994-08-06 Lost Circulation Occurred
1994-08-14 Finished Drilling
1994-08-14 Well Mode changed to Drilled and Cased
1994-08-15 Drill Stem Test Performed
1994-08-15 Well Log Performed
1994-08-17 Drill Stem Test Performed
1994-08-18 Production Casing Operation Performed
1994-08-19 Rig Released
1994-08-29 Well Log Performed
1994-09-06 Perforation Treatment Performed - Jet Perforation
1994-09-07 Well Began Production
1994-09-07 Well Fluid changed to Crude Oil
1994-09-07 Well Mode changed to Pumping
1996-07-27 Well Log Performed
1996-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-28 Plug Back Performed
1996-07-28 Well Fluid changed to Crude Oil
1996-07-28 Well Mode changed to Abandoned Zone
1996-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-29 Perforation Treatment Performed - Jet Perforation
1996-07-29 Plug Back Performed
1996-07-29 Well Log Performed
1996-07-30 Perforation Treatment Performed - Jet Perforation
1996-07-31 Perforation Treatment Performed - Jet Perforation
1996-07-31 Well Log Performed
1996-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-02 Plug Back Performed
2002-03-04 Perforation Treatment Performed - Jet Perforation
2002-03-06 Well Log Performed
2002-03-07 Perforation Treatment Performed - Jet Perforation
2002-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-12 Well Log Performed
2002-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-06 Perforation 2143.50 2145.50 13
1996-07-31 Perforation 823.00 826.50 14
1996-08-02 Packing Device Capped w/Cement 801.00 809.00 0
2002-03-04 Perforation 823.00 826.50 14
2002-03-04 Perforation 828.00 829.50 14
2002-03-04 Perforation 835.00 836.00 14
2002-03-04 Perforation 860.00 861.00 14
2002-03-04 Perforation 866.00 870.50 14
2002-03-04 Perforation 872.50 875.50 14
2002-03-07 Perforation 923.00 925.00 13
2002-03-07 Perforation 907.00 910.00 13
1996-07-28 Packing Device Capped w/Cement 2122.00 2130.00 0
2002-03-07 Perforation 887.00 893.00 13
2002-03-07 Perforation 882.00 887.00 13
2002-03-08 Acid Treatment 823.00 925.00 0
2002-10-19 Acid Treatment 823.00 826.50 0
2002-10-19 Acid Treatment 828.00 829.00 0
2002-10-19 Acid Treatment 835.00 836.00 0
2002-10-19 Acid Treatment 860.00 861.00 0
2002-10-19 Acid Treatment 866.00 870.50 0
2002-10-19 Acid Treatment 872.50 875.50 0
2002-10-19 Acid Treatment 882.00 893.00 0
1996-07-29 Packing Device Capped w/Cement 1072.00 1075.00 0
2002-10-19 Acid Treatment 907.00 910.00 0
2002-10-19 Acid Treatment 923.00 925.00 0
2002-12-11 Acid Treatment 823.00 826.50 0
2002-12-11 Acid Treatment 828.00 829.00 0
2002-12-11 Acid Treatment 835.00 836.00 0
2003-12-23 Acid Treatment 823.00 826.50 0
2003-12-23 Acid Treatment 828.00 829.50 0
2003-12-23 Acid Treatment 835.00 836.00 0
2003-12-23 Acid Treatment 860.00 861.00 0
2003-12-23 Acid Treatment 866.00 870.50 0
1996-07-29 Perforation 872.50 875.50 14
2003-12-23 Acid Treatment 872.50 875.50 0
2003-12-23 Acid Treatment 923.00 925.00 0
2003-12-23 Acid Treatment 907.00 910.00 0
2003-12-23 Acid Treatment 887.00 893.00 0
2003-12-23 Acid Treatment 882.00 887.00 0
1996-07-29 Perforation 866.00 870.50 14
1996-07-29 Perforation 860.00 861.00 13
1996-07-29 Packing Device Capped w/Cement 847.00 855.00 0
1996-07-29 Perforation 828.00 829.50 14
1996-07-30 Perforation 835.00 836.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1445 0.0 0.0 0.0
1996 78 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-08-06 Lost Circulation 815.00 2215.00

For data sources see[6]

References