X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756100906000

Well Details

Well ID: 0756100906000
Loading map...
Location: 00/06-09-075-10W6/0
Location Alias: 00/06-09-75-10 W6M
Location Alias 2: 00/06-09-075-10 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 10
Section: 09
County/Municipality: County of Grande Prairie No. 1
Well Name: NRK VALHALLA 6-9-75-10
Operator Name: TAQA North Ltd.
License Number: 0046250
License Date: 1973-06-20
License Status: Abandoned
Spud Date: 1973-06-25
Final Drill Date: 1973-07-15
Well Total Depth: 2164.10 m
Surface Hole Latitude: 55.480457
Surface Hole Longitude: -119.491855

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-06-20 Obtained License
1973-07-09 Drill Stem Test Performed
1973-07-10 Drill Stem Test Performed
1973-07-11 Drill Stem Test Performed
1973-07-15 Finished Drilling
1973-07-17 Production Casing Operation Performed
1973-07-22 Perforation Treatment Performed - Jet Perforation
1973-07-22 Perforation Treatment Performed - Remedial Casing
1973-08-24 Perforation Treatment Performed - Jet Perforation
1973-08-28 Perforation Treatment Performed - Fractured
1973-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-09-08 Perforation Treatment Performed - Jet Perforation
1973-09-08 Perforation Treatment Performed - Remedial Casing
1973-09-09 Perforation Treatment Performed - Jet Perforation
1973-09-09 Perforation Treatment Performed - Remedial Casing
1973-09-10 Perforation Treatment Performed - Remedial Casing
1973-09-28 Perforation Treatment Performed - Jet Perforation
1973-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-04 Well Mode changed to Drilled and Cased
1984-02-02 Well Log Performed
1984-02-03 Perforation Treatment Performed - Jet Perforation
1984-02-03 Well Mode changed to Drilled and Cased
1996-08-22 Well Log Performed
1996-08-27 Perforation Treatment Performed - Jet Perforation
1996-08-27 Perforation Treatment Performed - Remedial Casing
1996-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-02 Perforation Treatment Performed - Jet Perforation
1996-10-02 Plug Back Performed
1996-10-02 Well Log Performed
1996-10-02 Well Mode changed to Abandoned Zone
1996-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-06 Plug Back Performed
1996-10-10 Perforation Treatment Performed - Jet Perforation
1996-10-10 Well Log Performed
1996-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-29 Perforation Treatment Performed - Fractured
1998-11-20 Perforation Treatment Performed - Cement Squeeze
1998-11-20 Plug Back Performed
1998-11-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-07-22 Perforation 1371.50 1373.00 7
1973-09-08 Remedial Casing Cementing 1635.20 1636.70 0
1973-09-08 Perforation 1371.50 1373.00 7
1973-09-09 Perforation 806.20 807.70 7
1973-09-09 Remedial Casing Cementing 806.20 807.70 0
1973-09-10 Remedial Casing Cementing 1371.50 1373.00 0
1973-09-28 Perforation 1660.90 1665.10 7
1973-09-29 Acid Treatment 1660.90 1665.10 0
1984-02-03 Perforation 714.80 718.10 13
1996-08-27 Perforation 1690.00 1691.00 7
1996-08-27 Remedial Casing Cementing 1690.00 1691.00 0
1973-07-22 Perforation 2148.70 2150.00 7
1996-10-02 Packing Device Capped w/Cement 1353.60 1361.60 0
1996-10-02 Perforation 769.90 773.20 13
1996-10-04 Acid Treatment 769.90 773.20 0
1996-10-06 Packing Device Capped w/Cement 754.00 783.00 0
1996-10-10 Perforation 714.80 718.10 13
1996-10-10 Perforation 724.00 726.60 13
1996-10-11 Acid Treatment 714.80 726.60 0
1997-01-29 Fracture 714.80 726.60 0
1998-11-20 Cement Squeeze 714.80 726.60 0
1973-07-22 Remedial Casing Cementing 1371.50 2150.00 0
1973-07-22 Perforation 806.20 807.70 7
1973-07-22 Remedial Casing Cementing 806.20 807.70 0
1973-08-24 Perforation 2011.70 2012.90 7
1973-08-28 Fracture 2011.70 2012.90 0
1973-09-08 Packing Device Capped w/Cement 1713.00 1713.00 0
1973-09-08 Perforation 1635.20 1636.70 7

For data sources see[4]



References