If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765102705020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.612088,"lon":-115.472474,"icon":""}]} |
Location: 02/05-27-076-10W5/0 | |
Location Alias: 02/05-27-76-10 W5M | |
Location Alias 2: 02/05-27-076-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 10 | |
Section: 27 | |
County/Municipality: Big Lakes County | |
Well Name: HESS SALT CREEK 5-27-76-10 | |
Operator Name: 177293 Canada Ltd. | |
License Number: 0147286 | |
License Date: 1991-01-09 | |
License Status: RecCertified | |
Spud Date: 1991-02-09 | |
Final Drill Date: 1991-02-13 | |
Well Total Depth: 820.00 m | |
Surface Hole Latitude: 55.612088 | |
Surface Hole Longitude: -115.472474 |
Date | Event |
---|---|
1991-01-09 | Obtained License |
1991-02-10 | Surface Casing Operation Performed |
1991-02-13 | Finished Drilling |
1991-02-13 | Well Log Performed |
1991-02-14 | Production Casing Operation Performed |
1991-02-14 | Rig Released |
1991-02-14 | Well Mode changed to Drilled and Cased |
1991-02-26 | Well Log Performed |
1991-02-28 | Well Log Performed |
1991-03-01 | Perforation Treatment Performed - Jet Perforation |
1991-03-03 | Well Log Performed |
1991-03-21 | Well Fluid changed to Crude Oil |
1991-03-21 | Well Mode changed to Potential |
1991-03-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-03-22 | Plug Back Performed |
1991-03-22 | Well Abandoned |
1991-03-22 | Well Fluid changed to Crude Oil |
1991-03-22 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-03-01 | Perforation | 773.00 | 784.00 | 13 |
1991-03-01 | Perforation | 785.50 | 788.20 | 13 |
1991-03-22 | Packing Device Capped w/Cement | 755.00 | 765.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 336 | 0.0 | 0.0 | 0.0 |
For data sources see[5]