X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0765111304002

Well Details

Well ID: 0765111304002
Loading map...
Location: 00/04-13-076-11W5/2
Location Alias: 00/04-13-76-11 W5M
Location Alias 2: 00/04-13-076-11 W5/02
Country: Canada
Province: Alberta
Township: 076
Meridian: 5
Range: 11
Section: 13
County/Municipality: Big Lakes County
Well Name: KIN MERC RANDELL 4-13-76-11
Operator Name: KinMerc Oil & Gas Inc.
License Number: 0212050
License Date: 1998-01-15
License Status: Amended
Spud Date: 1998-02-13
Final Drill Date: 1998-02-21
Well Total Depth: 2024.00 m
Surface Hole Latitude: 55.579969
Surface Hole Longitude: -115.576924

For data sources see[1][2]

Well History

Date Event
1998-01-15 Obtained License
1998-02-14 Surface Casing Operation Performed
1998-02-21 Finished Drilling
1998-02-21 Well Mode changed to Drilled and Cased
1998-02-22 Well Log Performed
1998-02-23 Production Casing Operation Performed
1998-02-24 Rig Released
1998-03-01 Well Log Performed
1998-03-04 Perforation Treatment Performed - Jet Perforation
1998-03-04 Well Log Performed
1998-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-03-05 Well Log Performed
2007-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-06 Perforation Treatment Performed - Jet Perforation
2007-03-06 Plug Back Performed
2007-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-03-13 Well Log Performed
2007-11-09 Well Began Injection
2007-11-09 Well Fluid changed to Water
2007-11-09 Well Type changed to Disposal
2008-02-08 Perforation Treatment Performed - Jet Perforation
2008-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-16 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-04 Perforation 1940.00 1941.50 14
2008-02-13 Acid Treatment 1208.00 1322.00 0
2010-12-16 Perforation 1186.50 1189.00 17
2010-12-16 Perforation 1181.50 1184.50 17
2010-12-16 Perforation 1131.50 1135.50 17
2010-12-16 Perforation 1095.50 1100.00 17
2010-12-16 Acid Treatment 1095.50 1330.00 0
1998-03-06 Acid Treatment 1940.00 1941.50 0
2007-03-06 Packing Device Capped w/Cement 1927.00 1935.00 0
2007-03-06 Perforation 1320.00 1330.00 20
2007-03-09 Acid Treatment 1320.00 1330.00 0
2008-02-08 Perforation 1330.00 1332.00 17
2008-02-08 Perforation 1213.00 1215.00 17
2008-02-08 Perforation 1208.00 1211.00 17
2008-02-08 Perforation 1196.00 1204.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References