If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765140406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.554237,"lon":-116.112806,"icon":""}]} |
Location: 00/06-04-076-14W5/0 | |
Location Alias: 00/06-04-76-14 W5M | |
Location Alias 2: 00/06-04-076-14 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 14 | |
Section: 04 | |
County/Municipality: Big Lakes County | |
Well Name: HB UNION BUFFALO BAY 6-4-76-14 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0025653 | |
License Date: 1964-02-06 | |
License Status: RecCertified | |
Spud Date: 1964-02-12 | |
Final Drill Date: 1964-03-02 | |
Well Total Depth: 2132.10 m | |
Surface Hole Latitude: 55.554237 | |
Surface Hole Longitude: -116.112806 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-02-06 | Obtained License |
1964-02-18 | Drill Stem Test Performed |
1964-02-29 | Drill Stem Test Performed |
1964-03-01 | Drill Stem Test Performed |
1964-03-02 | Drill Stem Test Performed |
1964-03-02 | Finished Drilling |
1964-03-02 | Well Mode changed to Drilled and Cased |
1964-03-05 | Production Casing Operation Performed |
1964-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-03-07 | Perforation Treatment Performed - Jet Perforation |
1964-06-11 | Well Began Production |
1964-06-11 | Well Fluid changed to Crude Oil |
1964-06-11 | Well Mode changed to Pumping |
1964-10-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-12-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-07-13 | Well Fluid changed to Crude Oil |
1965-07-13 | Well Mode changed to Suspended |
1966-02-28 | Perforation Treatment Performed - Cement Plug |
1966-03-02 | Well Abandoned |
1966-03-02 | Well Fluid changed to Crude Oil |
1966-03-02 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1964-03-07 | Perforation | 2061.10 | 2065.30 | 13 |
1964-03-07 | Acid Treatment | 2061.10 | 2065.30 | 0 |
1964-10-14 | Acid Treatment | 2061.10 | 2065.30 | 0 |
1964-12-21 | Acid Treatment | 2061.10 | 2065.30 | 0 |
1966-02-28 | Cement Plug | 2026.90 | 2132.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1964 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]