If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765201614002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.589246,"lon":-117.041795,"icon":""}]} |
Location: 00/14-16-076-20W5/2 | |
Location Alias: 00/14-16-76-20 W5M | |
Location Alias 2: 00/14-16-076-20 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 20 | |
Section: 16 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: ANDERSON ET AL KENZIE 14-16-76-20 | |
Operator Name: Hutton Energy Ltd. | |
License Number: 0093954 | |
License Date: 1981-12-15 | |
License Status: Issued | |
Spud Date: 1981-12-18 | |
Final Drill Date: 1982-01-01 | |
Well Total Depth: 1351.00 m | |
Surface Hole Latitude: 55.589246 | |
Surface Hole Longitude: -117.041795 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-12-15 | Obtained License |
1982-01-01 | Finished Drilling |
1982-01-01 | Well Mode changed to Drilled and Cased |
1982-01-03 | Drill Stem Test Performed |
1982-01-04 | Drill Stem Test Performed |
1982-01-05 | Drill Stem Test Performed |
1982-01-08 | Drill Stem Test Performed |
1982-01-09 | Drill Stem Test Performed |
1982-01-10 | Production Casing Operation Performed |
1982-01-20 | Perforation Treatment Performed - Jet Perforation |
1982-01-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-09-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-09-06 | Plug Back Performed |
1993-09-06 | Well Log Performed |
1993-09-07 | Perforation Treatment Performed - Jet Perforation |
1993-09-09 | Perforation Treatment Performed - Fractured |
1993-09-10 | Well Log Performed |
1994-04-05 | Well Began Production |
1994-04-05 | Well Fluid changed to Gas |
1994-04-05 | Well Mode changed to Flowing |
1994-06-30 | Well Fluid changed to Gas |
1994-06-30 | Well Mode changed to Flowing |
1994-08-01 | Well Fluid changed to Gas |
1994-08-01 | Well Mode changed to Suspended |
1995-11-01 | Well Fluid changed to Gas |
1995-11-01 | Well Mode changed to Flowing |
1997-01-09 | Perforation Treatment Performed - Jet Perforation |
1997-01-09 | Well Log Performed |
1997-01-10 | Perforation Treatment Performed - Cement Squeeze |
1997-01-13 | Perforation Treatment Performed - Jet Perforation |
1997-01-13 | Well Log Performed |
1997-01-14 | Perforation Treatment Performed - Cement Squeeze |
1997-01-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-01-17 | Perforation Treatment Performed - Jet Perforation |
1997-01-17 | Well Log Performed |
2007-02-28 | Well Fluid changed to Gas |
2007-02-28 | Well Mode changed to Suspended |
2007-06-01 | Well Fluid changed to Gas |
2007-06-01 | Well Mode changed to Flowing |
2008-12-31 | Well Fluid changed to Gas |
2008-12-31 | Well Mode changed to Suspended |
2010-10-23 | Perforation Treatment Performed - Cement Squeeze |
2010-10-29 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-01-20 | Perforation | 1115.70 | 1118.70 | 7 |
1997-01-13 | Perforation | 1060.00 | 1060.60 | 13 |
1997-01-14 | Cement Squeeze | 1060.00 | 1060.60 | 0 |
1997-01-14 | Cement Squeeze | 1052.00 | 1054.10 | 0 |
1997-01-17 | Perforation | 1052.00 | 1054.00 | 18 |
1997-01-17 | Acid Treatment | 1052.00 | 1054.00 | 0 |
2010-10-23 | Cement Squeeze | 1052.00 | 1054.00 | 0 |
2010-10-29 | Perforation | 1122.50 | 1123.50 | 17 |
1982-01-23 | Acid Treatment | 1115.70 | 1118.70 | 0 |
1986-12-16 | Acid Treatment | 1115.70 | 1118.70 | 0 |
1986-12-18 | Acid Treatment | 1115.70 | 1118.70 | 0 |
1993-09-06 | Packing Device Capped w/Cement | 1102.00 | 1110.00 | 0 |
1993-09-07 | Perforation | 1052.00 | 1054.10 | 13 |
1993-09-09 | Fracture | 1052.00 | 1054.10 | 0 |
1997-01-09 | Perforation | 1065.00 | 1065.60 | 13 |
1997-01-10 | Cement Squeeze | 1065.00 | 1065.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 1636 | 0.0 | 0.0 | 0.0 |
1995 | 688 | 0.0 | 0.0 | 0.0 |
1996 | 3474 | 0.0 | 0.0 | 0.0 |
1997 | 8160 | 0.0 | 0.0 | 0.0 |
1998 | 7284 | 0.0 | 0.0 | 0.0 |
1999 | 7517 | 0.0 | 0.0 | 0.0 |
2000 | 7129 | 0.0 | 0.0 | 0.0 |
2001 | 7102 | 0.0 | 0.0 | 0.0 |
2002 | 7388 | 0.0 | 0.0 | 0.0 |
2003 | 8599 | 0.0 | 0.0 | 0.0 |
2004 | 7934 | 0.0 | 0.0 | 0.0 |
2005 | 7960 | 0.0 | 0.0 | 0.0 |
2006 | 1416 | 0.0 | 0.0 | 0.0 |
2007 | 3624 | 0.0 | 0.0 | 0.0 |
For data sources see[5]