Well ID: 0765221513020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.592871,"lon":-117.32987,"icon":""}]} |
Location: 02/13-15-076-22W5/0 | |
Location Alias: 02/13-15-76-22 W5M | |
Location Alias 2: 02/13-15-076-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 22 | |
Section: 15 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: GUIDEX GVILLEE 13-15-76-22 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0404609 | |
License Date: 2008-11-25 | |
License Status: Suspension | |
Spud Date: 2009-07-05 | |
Final Drill Date: 2009-07-18 | |
Well Total Depth: 2515.00 m | |
Surface Hole Latitude: 55.592871 | |
Surface Hole Longitude: -117.329870 |
Date | Event |
---|---|
2008-11-25 | Obtained License |
2009-07-08 | Surface Casing Operation Performed |
2009-07-11 | Direction Drilling Operation Performed - Deviate |
2009-07-18 | Finished Drilling |
2009-07-18 | Well Log Performed |
2009-07-18 | Well Mode changed to Drilled and Cased |
2009-07-19 | Well Log Performed |
2009-07-20 | Well Log Performed |
2009-07-21 | Production Casing Operation Performed |
2009-07-22 | Rig Released |
2009-07-26 | Well Log Performed |
2009-07-27 | Perforation Treatment Performed - Jet Perforation |
2009-07-27 | Well Log Performed |
2010-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-03-12 | Plug Back Performed |
2010-03-12 | Well Log Performed |
2010-03-12 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-07-11 | 1150.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-07-27 | Perforation | 2481.00 | 2486.00 | 20 |
2010-03-12 | Packing Device Capped w/Cement | 2467.00 | 2475.00 | 0 |
For data sources see[5]