If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0766120812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.583467,"lon":-119.860718,"icon":""}]} |
| Location: 00/12-08-076-12W6/0 | |
| Location Alias: 00/12-08-76-12 W6M | |
| Location Alias 2: 00/12-08-076-12 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 076 | |
| Meridian: 6 | |
| Range: 12 | |
| Section: 08 | |
| County/Municipality: Saddle Hills County | |
| Well Name: AVN HZ GLACIER 12-8-76-12 | |
| Operator Name: Advantage Oil & Gas Ltd. | |
| License Number: 0437299 | |
| License Date: 2011-09-30 | |
| License Status: Issued | |
| Spud Date: 2012-02-08 | |
| Final Drill Date: 2012-02-23 | |
| Well Total Depth: 4410.00 m | |
| Surface Hole Latitude: 55.583467 | |
| Surface Hole Longitude: -119.860718 |
| Date | Event |
|---|---|
| 2011-09-30 | Obtained License |
| 2012-02-10 | Surface Casing Operation Performed |
| 2012-02-14 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-23 | Finished Drilling |
| 2012-02-23 | Well Log Performed |
| 2012-02-23 | Well Mode changed to Drilled and Cased |
| 2012-02-25 | Production Casing Operation Performed |
| 2012-02-26 | Rig Released |
| 2013-02-16 | Well Log Performed |
| 2013-02-17 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-07-03 | Well Began Production |
| 2013-07-03 | Well Fluid changed to Gas |
| 2013-07-03 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-08 | Ensign Drilling Inc. | 33 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-14 | 2070.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-02-17 | Open Hole/Barefoot Completion | 4390.00 | 4410.00 | 0 |
| 2013-02-19 | Multi-Stage Fracture | 3437.50 | 3437.60 | 0 |
| 2013-02-19 | Multi-Stage Fracture | 3332.00 | 3332.10 | 0 |
| 2013-02-19 | Multi-Stage Fracture | 3213.80 | 3213.90 | 0 |
| 2013-02-19 | Multi-Stage Fracture | 3095.80 | 3095.90 | 0 |
| 2013-02-20 | Multi-Stage Fracture | 2990.20 | 2990.30 | 0 |
| 2013-02-20 | Multi-Stage Fracture | 2872.20 | 2872.30 | 0 |
| 2013-02-20 | Multi-Stage Fracture | 2766.30 | 2766.40 | 0 |
| 2013-02-20 | Multi-Stage Fracture | 2647.80 | 2647.90 | 0 |
| 2013-02-20 | Multi-Stage Fracture | 2529.20 | 2529.30 | 0 |
| 2013-02-18 | Multi-Stage Fracture | 4353.20 | 4353.30 | 0 |
| 2013-02-18 | Multi-Stage Fracture | 4240.20 | 4240.30 | 0 |
| 2013-02-18 | Multi-Stage Fracture | 4122.10 | 4122.20 | 0 |
| 2013-02-18 | Multi-Stage Fracture | 4016.30 | 4016.40 | 0 |
| 2013-02-18 | Multi-Stage Fracture | 3897.90 | 3898.00 | 0 |
| 2013-02-18 | Multi-Stage Fracture | 3779.60 | 3779.70 | 0 |
| 2013-02-19 | Multi-Stage Fracture | 3674.10 | 3674.20 | 0 |
| 2013-02-19 | Multi-Stage Fracture | 3555.70 | 3555.80 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-02-18 | 2013-02-20 | 2,332 | 1,091 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 24.1307 | N/A | |||
| FRAC SAND 20/40 WHITE (OTTAWA TYPE) | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 15.3907 | N/A | ||
| FRAC SAND 30/50 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 13.8642 | N/A | ||
| FRAC SAND 50/140 CANADIAN | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.3758 | N/A | ||
| 2K7 Solution W-M | Baker Hughes | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0203 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0203 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0203 | N/A | ||||
| Breaker AB | Baker Hughes | Breaker | Distillates. hydrotreated middle. petroleum | 64742-46-7 | 100 | 0.0403 | N/A | |
| CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.0528 | N/A | |
| Carbon Dioxide. Liquid | Baker Hughes | Energizing Fluid | Carbon dioxide. refrigerated liquid | 124-38-9 | 100 | 45.817 | N/A | |
| FAC-1W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.0324 | N/A | |
| N.N-Dimethyloctadecylamine | 124-28-7 | 100 | 0.0324 | N/A | ||||
| N.N-Dimethyloctadecylamine hydrochloride | 1613-17-8 | 100 | 0.0324 | N/A | ||||
| Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.0324 | N/A | ||||
| FAC-3W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.2751 | N/A | |
| Sodium xylene sulphonate | 1300-72-7 | 100 | 0.2751 | N/A | ||||
| Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.2751 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-02-20 | 2013-02-20 | Surface Water - Lake | 312 |
| 2013-02-13 | 2013-03-12 | Central Water Distribution Facility | 90 |
| 2013-02-09 | 2013-02-09 | Central Water Distribution Facility | 32 |
| 2013-02-17 | 2013-02-19 | Municipal Water | 669 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 4201 | 0.0 | 0.0 | 0.0 |
| 2014 | 7386 | 0.0 | 0.0 | 0.0 |
| 2015 | 6797 | 0.0 | 0.0 | 0.0 |
| 2016 | 8487 | 0.0 | 0.0 | 0.0 |
| 2017 | 7674 | 0.0 | 0.0 | 0.0 |
| 2018 | 7334 | 0.0 | 0.0 | 0.0 |
| 2019 | 5221 | 0.0 | 0.0 | 0.0 |
| 2020 | 1992 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-03-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]