If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766130616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.557973,"lon":-119.98052,"icon":""}]} |
Location: 00/16-06-076-13W6/0 | |
Location Alias: 00/16-06-76-13 W6M | |
Location Alias 2: 00/16-06-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 06 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 16-6-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0411321 | |
License Date: 2009-07-07 | |
License Status: Amended | |
Spud Date: 2009-11-28 | |
Final Drill Date: 2009-12-17 | |
Well Total Depth: 3675.00 m | |
Surface Hole Latitude: 55.557973 | |
Surface Hole Longitude: -119.980520 |
Date | Event |
---|---|
2009-07-07 | Obtained License |
2009-11-30 | Surface Casing Operation Performed |
2009-12-09 | Direction Drilling Operation Performed - Horizontal |
2009-12-14 | Well Log Performed |
2009-12-17 | Finished Drilling |
2009-12-17 | Well Log Performed |
2009-12-17 | Well Mode changed to Drilled and Cased |
2009-12-20 | Well Log Performed |
2009-12-21 | Production Casing Operation Performed |
2009-12-21 | Rig Released |
2010-02-26 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-02-26 | Perforation Treatment Performed - Fractured |
2010-02-27 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-02-27 | Perforation Treatment Performed - Fractured |
2010-02-28 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-02-28 | Perforation Treatment Performed - Fractured |
2010-03-01 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-03-01 | Perforation Treatment Performed - Fractured |
2010-05-18 | Well Began Production |
2010-05-18 | Well Fluid changed to Gas |
2010-05-18 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-12-09 | 2363.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-26 | Hydra Jet Perforation | 3643.00 | 3644.00 | 3 |
2010-02-27 | Hydra Jet Perforation | 3279.00 | 3283.00 | 3 |
2010-02-27 | Acid Treatment | 3279.00 | 3283.00 | 0 |
2010-02-28 | Fracture | 3279.00 | 3283.00 | 0 |
2010-02-28 | Hydra Jet Perforation | 3116.00 | 3123.00 | 3 |
2010-02-28 | Acid Treatment | 3116.00 | 3123.00 | 0 |
2010-02-28 | Fracture | 3116.00 | 3123.00 | 0 |
2010-02-28 | Hydra Jet Perforation | 3015.50 | 3017.50 | 3 |
2010-02-28 | Acid Treatment | 3015.50 | 3017.50 | 0 |
2010-03-01 | Fracture | 3015.50 | 3017.50 | 0 |
2010-03-01 | Hydra Jet Perforation | 2899.00 | 2903.00 | 3 |
2010-02-26 | Acid Treatment | 3643.00 | 3644.00 | 0 |
2010-03-01 | Acid Treatment | 2899.00 | 2903.00 | 0 |
2010-03-01 | Fracture | 2899.00 | 2903.00 | 0 |
2010-03-01 | Hydra Jet Perforation | 2770.00 | 2776.00 | 3 |
2010-03-01 | Acid Treatment | 2770.00 | 2776.00 | 0 |
2010-03-01 | Fracture | 2770.00 | 2776.00 | 0 |
2010-02-26 | Fracture | 3643.00 | 3644.00 | 0 |
2010-02-26 | Hydra Jet Perforation | 3527.00 | 3528.00 | 3 |
2010-02-26 | Acid Treatment | 3527.00 | 3528.00 | 0 |
2010-02-26 | Fracture | 3527.00 | 3528.00 | 0 |
2010-02-27 | Hydra Jet Perforation | 3398.00 | 3403.00 | 3 |
2010-02-27 | Acid Treatment | 3398.00 | 3403.00 | 0 |
2010-02-27 | Fracture | 3398.00 | 3403.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 5219 | 0.0 | 0.0 | 0.0 |
2011 | 8445 | 0.0 | 0.0 | 0.0 |
2012 | 8201 | 0.0 | 0.0 | 0.0 |
2013 | 7321 | 0.0 | 0.0 | 0.0 |
2014 | 6961 | 0.0 | 0.0 | 0.0 |
2015 | 4412 | 0.0 | 0.0 | 0.0 |
2016 | 6764 | 0.0 | 0.0 | 0.0 |
2017 | 4516 | 0.0 | 0.0 | 0.0 |
2018 | 4018 | 0.0 | 0.0 | 0.0 |
2019 | 6060 | 0.0 | 0.0 | 0.0 |
2020 | 1670 | 0.0 | 0.0 | 0.0 |
For data sources see[6]