If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0775050909002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.65913,"lon":-114.704699,"icon":""}]} |
Location: 00/09-09-077-05W5/2 | |
Location Alias: 00/09-09-77-05 W5M | |
Location Alias 2: 00/09-09-077-05 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 5 | |
Range: 05 | |
Section: 09 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: FIRENZE MARTEN 9-9-77-5 | |
Operator Name: Firenze Energy Ltd. | |
License Number: 0173088 | |
License Date: 1994-11-28 | |
License Status: Suspension | |
Spud Date: 1995-01-18 | |
Final Drill Date: 1995-01-20 | |
Well Total Depth: 630.00 m | |
Surface Hole Latitude: 55.659130 | |
Surface Hole Longitude: -114.704699 |
Date | Event |
---|---|
1994-11-28 | Obtained License |
1995-01-19 | Surface Casing Operation Performed |
1995-01-20 | Finished Drilling |
1995-01-20 | Well Log Performed |
1995-01-20 | Well Mode changed to Drilled and Cased |
1995-01-21 | Production Casing Operation Performed |
1995-01-21 | Well Log Performed |
1995-01-22 | Rig Released |
1995-02-04 | Perforation Treatment Performed - Jet Perforation |
1995-02-04 | Well Log Performed |
2008-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-14 | Perforation Treatment Performed - Jet Perforation |
2008-02-14 | Well Log Performed |
2008-03-15 | Well Began Production |
2008-03-15 | Well Fluid changed to Gas |
2008-03-15 | Well Mode changed to Flowing |
2011-04-13 | Well Fluid changed to Gas |
2011-04-13 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-02-04 | Perforation | 595.70 | 596.50 | 13 |
2008-02-14 | Packing Device Capped w/Cement | 582.00 | 590.00 | 0 |
2008-02-14 | Perforation | 560.50 | 564.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 7343 | 0.0 | 0.0 | 0.0 |
2009 | 8535 | 0.0 | 0.0 | 0.0 |
2010 | 7391 | 0.0 | 0.0 | 0.0 |
For data sources see[5]