If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0775173110003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.717986,"lon":-116.622499,"icon":""}]} |
| Location: 00/10-31-077-17W5/3 | |
| Location Alias: 00/10-31-77-17 W5M | |
| Location Alias 2: 00/10-31-077-17 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 31 | |
| County/Municipality: Big Lakes County | |
| Well Name: GALLEON WINAGAMI 10-31-77-17 | |
| Operator Name: Long Run Exploration Ltd. | |
| License Number: 0112998 | |
| License Date: 1985-01-31 | |
| License Status: Abandoned | |
| Spud Date: 1986-01-08 | |
| Final Drill Date: 1986-01-26 | |
| Well Total Depth: 2280.00 m | |
| Surface Hole Latitude: 55.717986 | |
| Surface Hole Longitude: -116.622499 |
| Date | Event |
|---|---|
| 1985-01-31 | Obtained License |
| 1986-01-09 | Surface Casing Operation Performed |
| 1986-01-26 | Finished Drilling |
| 1986-01-26 | Well Mode changed to Drilled and Cased |
| 1986-01-27 | Well Log Performed |
| 1986-01-28 | Drill Stem Test Performed |
| 1986-01-29 | Drill Stem Test Performed |
| 1986-01-30 | Drill Stem Test Performed |
| 1986-02-01 | Plug Back Performed |
| 1986-02-02 | Plug Back Performed |
| 1986-02-02 | Production Casing Operation Performed |
| 1986-02-02 | Rig Released |
| 1986-02-02 | Well Log Performed |
| 1986-04-01 | Drill Stem Test Performed |
| 1997-03-19 | Perforation Treatment Performed - Jet Perforation |
| 1997-03-19 | Well Log Performed |
| 1997-03-25 | Perforation Treatment Performed - Jet Perforation |
| 1997-03-25 | Well Log Performed |
| 2000-11-28 | Well Log Performed |
| 2000-11-29 | Perforation Treatment Performed - Jet Perforation |
| 2000-11-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-11-30 | Plug Back Performed |
| 2000-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-12-01 | Plug Back Performed |
| 2000-12-01 | Well Mode changed to Abandoned Zone |
| 2000-12-02 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-02-26 | Plug Back Performed |
| 2008-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-02-27 | Plug Back Performed |
| 2008-03-03 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1997-03-19 | Perforation | 844.50 | 845.50 | 17 |
| 1997-03-25 | Perforation | 763.00 | 765.00 | 17 |
| 2000-11-29 | Perforation | 831.00 | 833.50 | 17 |
| 2000-11-30 | Packing Device Capped w/Cement | 834.00 | 842.00 | 0 |
| 2000-12-01 | Packing Device Capped w/Cement | 818.00 | 826.00 | 0 |
| 2000-12-02 | Perforation | 795.00 | 796.50 | 17 |
| 2008-02-26 | Packing Device Capped w/Cement | 783.00 | 791.00 | 0 |
| 2008-02-27 | Packing Device Capped w/Cement | 752.50 | 760.50 | 0 |
For data sources see[4]