If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0776092901000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.695441,"lon":-119.35046,"icon":""}]} |
| Location: 00/01-29-077-09W6/0 | |
| Location Alias: 00/01-29-77-09 W6M | |
| Location Alias 2: 00/01-29-077-09 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 6 | |
| Range: 09 | |
| Section: 29 | |
| County/Municipality: Saddle Hills County | |
| Well Name: LONGSHORE PROGRESS 1-29-77-9 | |
| Operator Name: Longshore Resources Ltd. | |
| License Number: 0314219 | |
| License Date: 2004-09-02 | |
| License Status: Suspension | |
| Spud Date: 2004-11-03 | |
| Final Drill Date: 2004-11-13 | |
| Well Total Depth: 1951.00 m | |
| Surface Hole Latitude: 55.695441 | |
| Surface Hole Longitude: -119.350460 |
| Date | Event |
|---|---|
| 2004-09-02 | Obtained License |
| 2004-11-05 | Surface Casing Operation Performed |
| 2004-11-13 | Finished Drilling |
| 2004-11-13 | Well Mode changed to Drilled and Cased |
| 2004-11-14 | Well Log Performed |
| 2004-11-16 | Production Casing Operation Performed |
| 2004-11-16 | Rig Released |
| 2004-11-24 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-25 | Perforation Treatment Performed - Fractured |
| 2004-12-21 | Well Began Production |
| 2004-12-21 | Well Fluid changed to Crude Oil |
| 2004-12-21 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-11-24 | Perforation | 1921.50 | 1927.50 | 20 |
| 2004-11-25 | Fracture | 1921.50 | 1927.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 186 | 0.0 | 0.0 | 0.0 |
| 2005 | 5652 | 0.0 | 0.0 | 0.0 |
| 2006 | 7813 | 0.0 | 0.0 | 0.0 |
| 2007 | 8543 | 0.0 | 0.0 | 0.0 |
| 2008 | 8433 | 0.0 | 0.0 | 0.0 |
| 2009 | 5135 | 0.0 | 0.0 | 0.0 |
| 2010 | 8602 | 0.0 | 0.0 | 0.0 |
| 2011 | 8406 | 0.0 | 0.0 | 0.0 |
| 2012 | 8043 | 0.0 | 0.0 | 0.0 |
| 2013 | 8437 | 0.0 | 0.0 | 0.0 |
| 2014 | 7783 | 0.0 | 0.0 | 0.0 |
| 2015 | 5984 | 0.0 | 0.0 | 0.0 |
| 2016 | 7787 | 0.0 | 0.0 | 0.0 |
| 2017 | 8054 | 0.0 | 0.0 | 0.0 |
| 2018 | 3948 | 0.0 | 0.0 | 0.0 |
For data sources see[5]