X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785212003000

Well Details

Well ID: 0785212003000
Loading map...
Location: 00/03-20-078-21W5/0
Location Alias: 00/03-20-78-21 W5M
Location Alias 2: 00/03-20-078-21 W5/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 5
Range: 21
Section: 20
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ ROXANA 3-20-78-21
Operator Name: Long Run Exploration Ltd.
License Number: 0436016
License Date: 2011-08-15
License Status: Suspension
Spud Date: 2011-08-20
Final Drill Date: 2011-08-27
Well Total Depth: 2046.00 m
Surface Hole Latitude: 55.768537
Surface Hole Longitude: -117.207459

For data sources see[1][2]

Well History

Date Event
2011-08-15 Obtained License
2011-08-20 Well Log Performed
2011-08-21 Surface Casing Operation Performed
2011-08-22 Direction Drilling Operation Performed - Deviate
2011-08-24 Intermediate Casing Operation Performed
2011-08-25 Direction Drilling Operation Performed - Horizontal
2011-08-27 Finished Drilling
2011-08-27 Well Mode changed to Drilled and Cased
2011-08-28 Liner Casing Operation Performed
2011-08-29 Rig Released
2011-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-22 Perforation Treatment Performed - Open-Hole Completion
2011-09-24 Well Began Production
2011-09-24 Well Fluid changed to Crude Oil
2011-09-24 Well Mode changed to Pumping
2014-12-12 Well Began Injection
2014-12-12 Well Fluid changed to Water
2014-12-12 Well Type changed to Injection
2018-01-01 Well Fluid changed to Water
2018-01-01 Well Mode changed to Suspended
2018-01-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-22 647.00 Deviate (5 - 79 degrees)
2011-08-25 1046.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-22 Open Hole/Barefoot Completion 2043.00 2046.00 0
2011-09-22 Multi-Stage Fracture 1217.30 1217.40 0
2011-09-22 Multi-Stage Fracture 1119.90 1120.00 0
2011-09-22 Multi-Stage Fracture 1955.50 1955.60 0
2011-09-22 Multi-Stage Fracture 1898.40 1898.50 0
2011-09-22 Multi-Stage Fracture 1801.70 1801.80 0
2011-09-22 Multi-Stage Fracture 1704.40 1704.50 0
2011-09-22 Multi-Stage Fracture 1606.90 1607.00 0
2011-09-22 Multi-Stage Fracture 1509.20 1509.30 0
2011-09-22 Multi-Stage Fracture 1411.80 1411.90 0
2011-09-22 Multi-Stage Fracture 1314.60 1314.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2242 0.0 0.0 0.0
2012 6817 0.0 0.0 0.0
2013 7099 0.0 0.0 0.0
2014 3523 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-06-10 No Incident Encountered 0.00 0.00
2018-01-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References