X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795080302000

Well Details

Well ID: 0795080302000
Loading map...
Location: 00/02-03-079-08W5/0
Location Alias: 00/02-03-79-08 W5M
Location Alias 2: 00/02-03-079-08 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 08
Section: 03
County/Municipality: Northern Sunrise County
Well Name: AMOCO UNIT 216 NIPISI 7-3-79-8
Operator Name: Canadian Natural Resources Limited
License Number: 0083252
License Date: 1980-06-05
License Status: Suspension
Spud Date: 1980-06-10
Final Drill Date: 1980-06-23
Well Total Depth: 1753.00 m
Surface Hole Latitude: 55.812692
Surface Hole Longitude: -115.159888

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-05 Obtained License
1980-06-23 Finished Drilling
1980-06-26 Production Casing Operation Performed
1980-06-26 Well Mode changed to Drilled and Cased
1980-09-13 Perforation Treatment Performed - Jet Perforation
1980-09-14 Perforation Treatment Performed - Cement Squeeze
1980-09-15 Perforation Treatment Performed - Jet Perforation
1980-11-01 Well Began Production
1980-11-01 Well Fluid changed to Crude Oil
1980-11-01 Well Mode changed to Pumping
1985-04-12 Well Log Performed
1985-12-04 Perforation Treatment Performed - Jet Perforation
1985-12-05 Perforation Treatment Performed - Fractured
1989-11-08 Perforation Treatment Performed - Chemical Squeeze
1993-02-13 Perforation Treatment Performed - Chemical Squeeze
1993-12-02 Perforation Treatment Performed - Cement Squeeze
1993-12-07 Perforation Treatment Performed - Jet Perforation
1993-12-07 Well Log Performed
1996-02-06 Perforation Treatment Performed - Chemical Squeeze
1996-02-10 Perforation Treatment Performed - Bridge Plug No Cement Required
1996-02-10 Well Fluid changed to Crude Oil
1996-02-10 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-13 Perforation 1734.00 1736.00 13
1996-02-06 Chemical Squeeze 1724.00 1729.40 0
1996-02-10 Bridge Plug, No Cement 1711.90 1711.90 0
1980-09-14 Cement Squeeze 1734.00 1736.00 0
1980-09-15 Perforation 1724.50 1733.00 13
1985-12-04 Perforation 1734.00 1737.00 13
1985-12-05 Fracture 1724.50 1737.00 0
1989-11-08 Chemical Squeeze 1724.50 1737.00 0
1993-02-13 Chemical Squeeze 1724.50 1737.00 0
1993-12-02 Cement Squeeze 1724.50 1737.00 0
1993-12-07 Perforation 1724.00 1729.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1172 0.0 0.0 0.0
1981 8206 0.0 0.0 0.0
1982 6958 0.0 0.0 0.0
1985 409 0.0 0.0 0.0
1986 7108 0.0 0.0 0.0
1987 5874 0.0 0.0 0.0
1988 7126 0.0 0.0 0.0
1989 6930 0.0 0.0 0.0
1990 8307 0.0 0.0 0.0
1991 7826 0.0 0.0 0.0
1992 8639 0.0 0.0 0.0
1993 6238 0.0 0.0 0.0
1994 7888 0.0 0.0 0.0
1995 8419 0.0 0.0 0.0
1996 848 0.0 0.0 0.0

For data sources see[5]

References