X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0804050311000

Well Details

Well ID: 0804050311000
Loading map...
Location: 00/11-03-080-05W4/0
Location Alias: 00/11-03-80-05 W4M
Location Alias 2: 00/11-03-080-05 W4/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 4
Range: 05
Section: 03
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC 100 GRAHAM 11-3-80-5
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0143031
License Date: 1990-01-30
License Status: Abandoned
Spud Date: 1990-02-14
Final Drill Date: 1990-02-16
Well Total Depth: 460.00 m
Surface Hole Latitude: 55.908157
Surface Hole Longitude: -110.709003

For data sources see[1][2]

Well History

Date Event
1990-01-30 Obtained License
1990-02-14 Direction Drilling Operation Performed - Deviate
1990-02-14 Lost Circulation Occurred
1990-02-14 Surface Casing Operation Performed
1990-02-16 Finished Drilling
1990-02-16 Well Log Performed
1990-02-16 Well Mode changed to Drilled and Cased
1990-02-17 Production Casing Operation Performed
1990-02-17 Rig Released
1990-02-23 Perforation Treatment Performed - Jet Perforation
1990-02-23 Well Log Performed
1990-02-27 Well Log Performed
1990-02-28 Perforation Treatment Performed - Jet Perforation
1990-02-28 Well Log Performed
1990-03-29 Well Began Production
1990-03-29 Well Fluid changed to Gas
1990-03-29 Well Mode changed to Flowing
1994-03-17 Perforation Treatment Performed - Jet Perforation
1994-03-17 Well Fluid changed to Gas
1994-03-17 Well Mode changed to Flowing
1995-02-28 Well Fluid changed to Gas
1995-02-28 Well Mode changed to Suspended
1998-01-21 Well Log Performed
2017-02-27 Well Log Performed
2017-03-04 Perforation Treatment Performed - Cement Plug
2017-03-04 Plug Back Performed
2017-03-04 Well Fluid changed to Gas
2017-03-04 Well Mode changed to Abandoned Zone
2017-03-06 Perforation Treatment Performed - Jet Perforation
2017-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-03-08 Perforation Treatment Performed - Cement Plug
2017-03-08 Plug Back Performed
2017-03-09 Perforation Treatment Performed - Cement Plug
2017-03-09 Plug Back Performed
2018-02-05 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-02-14 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-23 Perforation 325.00 329.00 13
1990-02-28 Perforation 324.00 327.00 13
1994-03-17 Perforation 315.50 317.50 13
2017-03-04 Cement Plug 205.50 321.00 0
2017-03-06 Perforation 182.00 186.00 18
2017-03-07 Acid Treatment 182.00 186.00 0
2017-03-08 Cement Plug 114.00 205.50 0
2017-03-09 Cement Plug 10.00 114.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 6619 0.0 0.0 0.0
1991 7300 0.0 0.0 0.0
1992 6310 0.0 0.0 0.0
1993 5137 0.0 0.0 0.0
1994 1414 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1990-02-14 Lost Circulation 65.00 131.00

For data sources see[7]

References