X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0814062603000

Well Details

Well ID: 0814062603000
Loading map...
Location: 00/03-26-081-06W4/0
Location Alias: 00/03-26-81-06 W4M
Location Alias 2: 00/03-26-081-06 W4/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 4
Range: 06
Section: 26
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC 100 HZ CHARD 3-26-81-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0198833
License Date: 1997-02-28
License Status: Suspension
Spud Date: 1997-03-04
Final Drill Date: 1997-03-07
Well Total Depth: 420.00 m
Surface Hole Latitude: 56.043681
Surface Hole Longitude: -110.824807

For data sources see[1][2]

Well History

Date Event
1997-02-28 Obtained License
1997-03-05 Direction Drilling Operation Performed - Horizontal
1997-03-06 Surface Casing Operation Performed
1997-03-07 Finished Drilling
1997-03-07 Liner Casing Operation Performed
1997-03-07 Perforation Treatment Performed - Slotted Liner or Casing
1997-03-07 Rig Released
1997-03-07 Well Log Performed
1997-03-07 Well Mode changed to Drilled and Cased
1997-03-21 Well Log Performed
1997-04-08 Well Began Production
1997-04-08 Well Fluid changed to Gas
1997-04-08 Well Mode changed to Flowing
2014-02-01 Well Fluid changed to Gas
2014-02-01 Well Mode changed to Suspended
2015-02-03 Perforation Treatment Performed - Jet Perforation
2015-02-03 Well Log Performed
2015-02-04 Perforation Treatment Performed - Jet Perforation
2015-02-04 Well Log Performed
2015-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-06 Perforation Treatment Performed - Remedial Casing
2015-02-06 Plug Back Performed
2015-02-06 Well Fluid changed to Gas
2015-02-06 Well Mode changed to Abandoned Zone
2016-01-21 Perforation Treatment Performed - Jet Perforation
2016-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-01-22 Perforation Treatment Performed - Jet Perforation
2016-01-22 Well Log Performed
2016-01-23 Perforation Treatment Performed - Remedial Casing
2017-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-03-07 Perforation Treatment Performed - Jet Perforation
2017-03-07 Well Log Performed
2017-03-09 Perforation Treatment Performed - Remedial Casing
2018-01-16 Perforation Treatment Performed - Cement Squeeze
2018-01-16 Perforation Treatment Performed - Jet Perforation
2018-01-16 Plug Back Performed
2019-02-20 Perforation Treatment Performed - Cement Plug
2019-02-20 Plug Back Performed
2019-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-02-21 Perforation Treatment Performed - Jet Perforation
2019-02-22 Perforation Treatment Performed - Remedial Casing
2020-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-02-25 Perforation Treatment Performed - Jet Perforation
2020-02-25 Perforation Treatment Performed - Remedial Casing
2020-02-26 Perforation Treatment Performed - Bridge Plug No Cement Required

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-03-05 40.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-07 Slotted Liner 222.00 416.00 0
2016-01-23 Remedial Casing Cementing 76.50 78.50 0
2017-03-07 Perforation 114.00 116.00 18
2017-03-07 Acid Treatment 114.00 116.00 0
2017-03-09 Remedial Casing Cementing 114.00 116.00 0
2018-01-16 Perforation 72.00 75.00 18
2018-01-16 Cement Squeeze 72.00 75.00 0
2019-02-20 Cement Plug 48.00 67.50 0
2019-02-21 Perforation 45.00 47.00 17
2019-02-21 Acid Treatment 45.00 47.00 0
2019-02-22 Remedial Casing Cementing 45.00 47.00 0
2015-02-03 Perforation 113.00 115.00 18
2020-02-25 Perforation 37.00 38.00 17
2020-02-25 Acid Treatment 37.00 38.00 0
2020-02-25 Remedial Casing Cementing 37.00 38.00 0
2020-02-26 Bridge Plug, No Cement 34.20 34.80 0
2015-02-04 Perforation 63.00 65.00 18
2015-02-06 Remedial Casing Cementing 113.00 115.00 0
2015-02-06 Remedial Casing Cementing 63.00 65.00 0
2015-02-06 Packing Device Capped w/Cement 76.60 143.00 0
2016-01-21 Perforation 63.00 65.00 18
2016-01-22 Perforation 76.50 78.50 18
2016-01-22 Acid Treatment 76.50 78.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 6356 0.0 0.0 0.0
1998 8704 0.0 0.0 0.0
1999 8717 0.0 0.0 0.0
2000 8760 0.0 0.0 0.0
2001 8708 0.0 0.0 0.0
2002 8734 0.0 0.0 0.0
2003 8754 0.0 0.0 0.0
2004 8761 0.0 0.0 0.0
2005 8714 0.0 0.0 0.0
2006 8555 0.0 0.0 0.0
2007 7645 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8580 0.0 0.0 0.0
2010 8457 0.0 0.0 0.0
2011 8678 0.0 0.0 0.0
2012 5562 0.0 0.0 0.0
2013 578 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-07 No Incident Encountered 0.00 0.00
2016-01-24 No Incident Encountered 0.00 0.00
2017-03-15 No Incident Encountered 0.00 0.00
2018-01-18 No Incident Encountered 0.00 0.00
2019-02-23 No Incident Encountered 0.00 0.00
2020-02-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References