X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815112501000

Well Details

Well ID: 0815112501000
Loading map...
Location: 00/01-25-081-11W5/0
Location Alias: 00/01-25-81-11 W5M
Location Alias 2: 00/01-25-081-11 W5/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 11
Section: 25
County/Municipality: Northern Sunrise County
Well Name: WELLECO UTIKUMA 1-25-81-11
Operator Name: Welleco Ventures Ltd.
License Number: 0213609
License Date: 1998-02-20
License Status: Amended
Spud Date: 1998-02-24
Final Drill Date: 1998-03-16
Well Total Depth: 1804.00 m
Surface Hole Latitude: 56.046297
Surface Hole Longitude: -115.569153

For data sources see[1][2]

Well History

Date Event
1998-02-20 Obtained License
1998-02-24 Well Log Performed
1998-02-25 Surface Casing Operation Performed
1998-03-04 Drill Stem Test Performed
1998-03-06 Plug Back Performed
1998-03-06 Well Log Performed
1998-03-07 Direction Drilling Operation Performed - Deviate
1998-03-16 Finished Drilling
1998-03-16 Well Log Performed
1998-03-16 Well Mode changed to Drilled and Cased
1998-03-17 Production Casing Operation Performed
1998-03-17 Rig Released
1998-03-19 Well Log Performed
1998-03-20 Perforation Treatment Performed - Jet Perforation
1998-03-20 Well Log Performed
1998-04-01 Well Began Production
1998-04-01 Well Fluid changed to Crude Oil
1998-04-01 Well Mode changed to Pumping
1999-06-28 Well Fluid changed to Crude Oil
1999-06-28 Well Mode changed to Suspended
2004-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-13 Plug Back Performed
2004-02-13 Well Fluid changed to Crude Oil
2004-02-13 Well Log Performed
2004-02-13 Well Mode changed to Abandoned Zone
2004-02-26 Well Abandoned
2004-02-26 Well Fluid changed to Crude Oil
2004-02-26 Well Mode changed to Abandoned and Re-entered

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-03-07 950.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-20 Perforation 1779.00 1781.00 14
2004-02-13 Packing Device Capped w/Cement 1765.00 1773.00 0
2004-02-13 Packing Device Capped w/Cement 281.00 689.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 5966 0.0 0.0 0.0
1999 4255 0.0 0.0 0.0

For data sources see[6]

References