X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0815151306000

Well Details

Well ID: 0815151306000
Loading map...
Location: 00/06-13-081-15W5/0
Location Alias: 00/06-13-81-15 W5M
Location Alias 2: 00/06-13-081-15 W5/00
Country: Canada
Province: Alberta
Township: 081
Meridian: 5
Range: 15
Section: 13
County/Municipality: Northern Sunrise County
Well Name: NRI DD DAWSON 6-13-81-15
Operator Name: Summerland Energy Inc.
License Number: 0403414
License Date: 2008-11-05
License Status: Suspension
Spud Date: 2008-11-15
Final Drill Date: 2008-11-25
Well Total Depth: 2025.00 m
Surface Hole Latitude: 56.020454
Surface Hole Longitude: -116.209123

For data sources see[1][2]

Well History

Date Event
2008-11-05 Obtained License
2008-11-16 Surface Casing Operation Performed
2008-11-20 Direction Drilling Operation Performed - Deviate
2008-11-25 Finished Drilling
2008-11-25 Well Mode changed to Drilled and Cased
2008-11-26 Well Log Performed
2008-11-27 Well Log Performed
2008-11-28 Production Casing Operation Performed
2008-11-28 Rig Released
2008-12-02 Well Log Performed
2008-12-03 Perforation Treatment Performed - Jet Perforation
2008-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-12-08 Perforation Treatment Performed - Cement Squeeze
2008-12-11 Perforation Treatment Performed - Jet Perforation
2008-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-01-01 Well Began Production
2009-01-01 Well Fluid changed to Crude Oil
2009-01-01 Well Mode changed to Flowing
2009-02-03 Well Log Performed
2009-02-04 Perforation Treatment Performed - Jet Perforation
2009-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-07-01 Well Fluid changed to Crude Oil
2009-07-01 Well Mode changed to Pumping
2014-02-01 Well Fluid changed to Crude Oil
2014-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-11-20 913.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-03 Perforation 1962.00 1965.00 17
2008-12-04 Acid Treatment 1962.00 1965.00 0
2008-12-08 Cement Squeeze 1962.00 1965.00 0
2008-12-11 Perforation 1969.00 1971.00 17
2008-12-12 Acid Treatment 1969.00 1971.00 0
2009-02-04 Perforation 1962.00 1968.00 17
2009-02-05 Acid Treatment 1962.00 1968.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7866 0.0 0.0 0.0
2010 5052 0.0 0.0 0.0
2011 8160 0.0 0.0 0.0
2012 7905 0.0 0.0 0.0
2013 7146 0.0 0.0 0.0

For data sources see[6]

References