If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0816041809002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.022224,"lon":-118.601952,"icon":""}]} |
| Location: 00/09-18-081-04W6/2 | |
| Location Alias: 00/09-18-81-04 W6M | |
| Location Alias 2: 00/09-18-081-04 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 081 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 18 | |
| County/Municipality: Municipal District of Fairview No. 136 | |
| Well Name: CNRL DGU DUNVEG 9-18-81-4 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0048535 | |
| License Date: 1974-01-02 | |
| License Status: Issued | |
| Spud Date: 1974-01-03 | |
| Final Drill Date: 1974-01-21 | |
| Well Total Depth: 1495.70 m | |
| Surface Hole Latitude: 56.022224 | |
| Surface Hole Longitude: -118.601952 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1974-01-02 | Obtained License |
| 1974-01-04 | Lost Circulation Occurred |
| 1974-01-19 | Drill Stem Test Performed |
| 1974-01-21 | Finished Drilling |
| 1974-01-21 | Well Log Performed |
| 1974-01-21 | Well Mode changed to Drilled and Cased |
| 1974-01-22 | Production Casing Operation Performed |
| 1974-03-11 | Perforation Treatment Performed - Jet Perforation |
| 1974-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-03-12 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1974-03-15 | Perforation Treatment Performed - Fractured |
| 1974-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-03-17 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1974-03-17 | Perforation Treatment Performed - Jet Perforation |
| 1974-03-18 | Perforation Treatment Performed - Fractured |
| 1974-03-24 | Well Began Production |
| 1974-03-24 | Well Fluid changed to Gas |
| 1974-03-24 | Well Mode changed to Flowing |
| 1983-04-01 | Well Structure changed to Commingled |
| 1999-09-13 | Well Log Performed |
| 1999-09-14 | Perforation Treatment Performed - Jet Perforation |
| 1999-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-02-06 | Well Log Performed |
| 2001-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-02-08 | Perforation Treatment Performed - Fractured |
| 2001-02-12 | Well Log Performed |
| 2001-02-13 | Well Log Performed |
| 2001-02-14 | Perforation Treatment Performed - Jet Perforation |
| 2001-02-15 | Perforation Treatment Performed - Jet Perforation |
| 2001-02-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-02-18 | Perforation Treatment Performed - Cement Squeeze |
| 2001-02-18 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1974-03-11 | Perforation | 1447.20 | 1448.10 | 3 |
| 1974-03-17 | Acid Treatment | 1402.40 | 1416.70 | 0 |
| 1974-03-18 | Fracture | 1402.40 | 1416.70 | 0 |
| 1999-09-14 | Perforation | 1389.00 | 1394.20 | 17 |
| 1999-09-14 | Perforation | 1396.00 | 1399.00 | 17 |
| 1999-09-14 | Perforation | 1423.70 | 1427.10 | 17 |
| 1999-09-14 | Perforation | 1430.70 | 1433.80 | 17 |
| 1999-09-14 | Perforation | 1441.10 | 1445.40 | 20 |
| 1999-09-16 | Acid Treatment | 1441.10 | 1445.40 | 0 |
| 2001-02-08 | Acid Treatment | 1423.70 | 1433.80 | 0 |
| 2001-02-08 | Fracture | 1389.90 | 1399.00 | 0 |
| 1974-03-11 | Perforation | 1449.60 | 1452.40 | 3 |
| 2001-02-14 | Perforation | 1006.40 | 1008.40 | 17 |
| 2001-02-15 | Perforation | 1002.30 | 1004.90 | 17 |
| 2001-02-16 | Acid Treatment | 1002.30 | 1008.40 | 0 |
| 2001-02-18 | Cement Squeeze | 1002.30 | 1008.40 | 0 |
| 1974-03-12 | Acid Wash | 1447.20 | 1452.40 | 0 |
| 1974-03-12 | Acid Treatment | 1447.20 | 1452.40 | 0 |
| 1974-03-15 | Fracture | 1447.20 | 1452.40 | 0 |
| 1974-03-17 | Perforation | 1402.40 | 1403.90 | 3 |
| 1974-03-17 | Perforation | 1412.10 | 1414.00 | 3 |
| 1974-03-17 | Perforation | 1415.50 | 1416.70 | 3 |
| 1974-03-17 | Acid Wash | 1402.40 | 1416.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1974 | 5091 | 0.0 | 0.0 | 0.0 |
| 1975 | 8024 | 0.0 | 0.0 | 0.0 |
| 1976 | 8009 | 0.0 | 0.0 | 0.0 |
| 1977 | 6018 | 0.0 | 0.0 | 0.0 |
| 1978 | 7527 | 0.0 | 0.0 | 0.0 |
| 1979 | 8461 | 0.0 | 0.0 | 0.0 |
| 1980 | 4162 | 0.0 | 0.0 | 0.0 |
| 1981 | 7040 | 0.0 | 0.0 | 0.0 |
| 1982 | 8190 | 0.0 | 0.0 | 0.0 |
| 1983 | 2056 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1974-01-04 | Lost Circulation | 165.20 | 165.20 |
For data sources see[6]