X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0824061512AA0

Well Details

Well ID: 0824061512AA0
Loading map...
Location: AA/12-15-082-06W4/0
Location Alias: AA/12-15-82-06 W4M
Location Alias 2: AA/12-15-082-06 W4/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 4
Range: 06
Section: 15
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC 1AA NEWBY 12-15-82-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0451149
License Date: 2012-11-30
License Status: Abandoned
Spud Date: 2013-01-15
Final Drill Date: 2013-01-18
Well Total Depth: 278.00 m
Surface Hole Latitude: 56.110654
Surface Hole Longitude: -110.863057

For data sources see[1][2]

Well History

Date Event
2012-11-30 Obtained License
2013-01-16 Surface Casing Operation Performed
2013-01-18 Finished Drilling
2013-01-19 Well Log Performed
2013-01-20 Plug Back Performed
2013-01-20 Well Mode changed to Abandoned
2013-01-21 Rig Released
2016-02-19 Production Casing Operation Performed
2016-02-19 Well Log Performed
2016-02-28 Well Log Performed
2017-01-08 Well Log Performed
2017-01-17 Perforation Treatment Performed - Jet Perforation
2017-01-18 Perforation Treatment Performed - Cement Plug
2017-01-18 Perforation Treatment Performed - Remedial Casing
2018-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-02-10 Perforation Treatment Performed - Cement Plug
2018-02-10 Perforation Treatment Performed - Cement Squeeze
2018-02-10 Perforation Treatment Performed - Jet Perforation
2018-02-10 Plug Back Performed
2019-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-01-13 Perforation Treatment Performed - Cement Squeeze
2019-01-13 Perforation Treatment Performed - Jet Perforation
2020-01-18 Perforation Treatment Performed - Cement Plug
2020-01-18 Plug Back Performed
2020-02-07 Well Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-15 Tempco Drilling Company Inc. 3 N/A Drill To LD

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-17 Perforation 89.00 92.00 18
2019-01-13 Cement Squeeze 49.50 53.50 0
2020-01-18 Cement Plug 7.20 45.50 0
2017-01-18 Remedial Casing Cementing 89.00 92.00 0
2017-01-18 Cement Plug 84.00 92.00 0
2018-02-10 Cement Plug 71.10 83.50 0
2018-02-10 Perforation 64.00 67.00 18
2018-02-10 Acid Treatment 64.00 67.00 0
2018-02-10 Cement Squeeze 64.00 67.00 0
2019-01-13 Perforation 49.50 53.50 17
2019-01-13 Acid Treatment 49.50 53.50 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-21 No Incident Encountered 0.00 0.00
2016-02-22 No Incident Encountered 0.00 0.00
2017-01-19 No Incident Encountered 0.00 0.00
2018-02-10 No Incident Encountered 0.00 0.00
2019-01-15 No Incident Encountered 0.00 0.00
2020-02-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References