If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0824062111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.124155,"lon":-110.882814,"icon":""}]} |
Location: 00/11-21-082-06W4/0 | |
Location Alias: 00/11-21-82-06 W4M | |
Location Alias 2: 00/11-21-082-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 4 | |
Range: 06 | |
Section: 21 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: COP ET AL 100 NEWBY 11-21-82-6 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0390442 | |
License Date: 2008-01-03 | |
License Status: Abandoned | |
Spud Date: 2008-01-16 | |
Final Drill Date: 2008-01-29 | |
Well Total Depth: 607.00 m | |
Surface Hole Latitude: 56.124155 | |
Surface Hole Longitude: -110.882814 |
Date | Event |
---|---|
2008-01-03 | Obtained License |
2008-01-17 | Surface Casing Operation Performed |
2008-01-19 | Well Log Performed |
2008-01-20 | Intermediate Casing Operation Performed |
2008-01-20 | Well Log Performed |
2008-01-29 | Finished Drilling |
2008-01-29 | Perforation Treatment Performed - Open-Hole Completion |
2008-01-29 | Well Log Performed |
2008-01-29 | Well Mode changed to Drilled and Cased |
2008-01-30 | Well Log Performed |
2008-01-31 | Plug Back Performed |
2008-02-01 | Rig Released |
2009-01-19 | Well Log Performed |
2009-01-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-01-20 | Perforation Treatment Performed - Jet Perforation |
2009-01-21 | Perforation Treatment Performed - Fractured |
2009-01-21 | Perforation Treatment Performed - Jet Perforation |
2009-01-22 | Perforation Treatment Performed - Fractured |
2009-01-23 | Perforation Treatment Performed - Fractured |
2009-01-24 | Perforation Treatment Performed - Fractured |
2009-01-25 | Perforation Treatment Performed - Fractured |
2009-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-02-14 | Plug Back Performed |
2009-02-14 | Well Mode changed to Abandoned Zone |
2014-01-16 | Well Abandoned |
2014-01-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-01-29 | Open Hole/Barefoot Completion | 395.00 | 586.00 | 0 |
2009-01-21 | Perforation | 246.00 | 246.50 | 20 |
2009-01-21 | Perforation | 241.00 | 241.50 | 20 |
2009-01-21 | Perforation | 212.00 | 212.50 | 20 |
2009-01-21 | Perforation | 200.00 | 200.50 | 20 |
2009-01-21 | Perforation | 191.30 | 191.80 | 20 |
2009-01-21 | Fracture | 305.00 | 305.50 | 0 |
2009-01-22 | Fracture | 251.00 | 251.40 | 0 |
2009-01-23 | Fracture | 212.00 | 241.50 | 0 |
2009-01-24 | Fracture | 191.30 | 191.80 | 0 |
2009-01-25 | Fracture | 263.50 | 264.00 | 0 |
2009-01-20 | Packing Device Capped w/Cement | 361.00 | 382.00 | 0 |
2009-02-14 | Packing Device Capped w/Cement | 168.70 | 180.00 | 0 |
2009-01-20 | Perforation | 305.00 | 305.50 | 20 |
2009-01-20 | Perforation | 294.00 | 294.50 | 20 |
2009-01-20 | Perforation | 283.00 | 283.50 | 20 |
2009-01-21 | Perforation | 269.50 | 270.00 | 20 |
2009-01-21 | Perforation | 263.50 | 264.00 | 20 |
2009-01-21 | Perforation | 255.80 | 256.30 | 20 |
2009-01-21 | Perforation | 251.00 | 251.50 | 20 |
For data sources see[4]