If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0824073516020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.170014,"lon":-110.968647,"icon":""}]} |
Location: 02/16-35-082-07W4/0 | |
Location Alias: 02/16-35-82-07 W4M | |
Location Alias 2: 02/16-35-082-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 4 | |
Range: 07 | |
Section: 35 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: COPRC 102I16 HZ RESDELN 16-35-82-7 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0390414 | |
License Date: 2008-01-02 | |
License Status: Issued | |
Spud Date: 2008-02-04 | |
Final Drill Date: 2008-04-05 | |
Well Total Depth: 1658.00 m | |
Surface Hole Latitude: 56.170014 | |
Surface Hole Longitude: -110.968647 |
Date | Event |
---|---|
2007-12-24 | Well Log Performed |
2008-01-02 | Obtained License |
2008-02-05 | Surface Casing Operation Performed |
2008-02-22 | Well Log Performed |
2008-03-04 | Well Log Performed |
2008-03-22 | Direction Drilling Operation Performed - Horizontal |
2008-03-23 | Well Log Performed |
2008-03-24 | Intermediate Casing Operation Performed |
2008-04-05 | Finished Drilling |
2008-04-05 | Well Log Performed |
2008-04-05 | Well Mode changed to Drilled and Cased |
2008-04-06 | Well Log Performed |
2008-04-20 | Liner Casing Operation Performed |
2008-05-03 | Well Log Performed |
2008-05-07 | Liner Casing Operation Performed |
2008-05-07 | Perforation Treatment Performed - Open-Hole Completion |
2008-05-07 | Perforation Treatment Performed - Slotted Liner or Casing |
2008-05-09 | Rig Released |
2008-07-18 | Well Log Performed |
2009-01-01 | Well Began Production |
2009-01-01 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-03-22 | 150.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-05-07 | Slotted Liner | 668.00 | 1655.00 | 0 |
2008-05-07 | Open Hole/Barefoot Completion | 1655.00 | 1658.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]