If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0825131211000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.095051,"lon":-115.897376,"icon":""}]} |
Location: 00/11-12-082-13W5/0 | |
Location Alias: 00/11-12-82-13 W5M | |
Location Alias 2: 00/11-12-082-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 082 | |
Meridian: 5 | |
Range: 13 | |
Section: 12 | |
County/Municipality: Northern Sunrise County | |
Well Name: PROSPER SEAL 11-12-82-13 | |
Operator Name: Prosper Petroleum Ltd. | |
License Number: 0365512 | |
License Date: 2006-11-06 | |
License Status: Suspension | |
Spud Date: 2006-11-20 | |
Final Drill Date: 2006-11-26 | |
Well Total Depth: 783.60 m | |
Surface Hole Latitude: 56.095051 | |
Surface Hole Longitude: -115.897376 |
Date | Event |
---|---|
2006-11-06 | Obtained License |
2006-11-22 | Surface Casing Operation Performed |
2006-11-24 | Well Log Performed |
2006-11-25 | Intermediate Casing Operation Performed |
2006-11-26 | Finished Drilling |
2006-11-26 | Perforation Treatment Performed - Open-Hole Completion |
2006-11-26 | Well Log Performed |
2006-11-26 | Well Mode changed to Drilled and Cased |
2006-11-27 | Rig Released |
2006-12-01 | Well Began Production |
2006-12-01 | Well Fluid changed to Crude Bitumen |
2006-12-01 | Well Mode changed to Pumping |
2006-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-10-01 | Well Fluid changed to Crude Bitumen |
2015-10-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-11-26 | Open Hole/Barefoot Completion | 752.00 | 783.60 | 0 |
2006-12-12 | Acid Treatment | 753.00 | 782.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 495 | 0.0 | 0.0 | 0.0 |
2007 | 6356 | 0.0 | 0.0 | 0.0 |
2008 | 5012 | 0.0 | 0.0 | 0.0 |
2009 | 24 | 0.0 | 0.0 | 0.0 |
2010 | 8369 | 0.0 | 0.0 | 0.0 |
2011 | 8195 | 0.0 | 0.0 | 0.0 |
2012 | 6661 | 0.0 | 0.0 | 0.0 |
2013 | 7311 | 0.0 | 0.0 | 0.0 |
2014 | 864 | 0.0 | 0.0 | 0.0 |
For data sources see[5]