If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0825241606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.108504,"lon":-117.69819,"icon":""}]} |
| Location: 00/06-16-082-24W5/0 | |
| Location Alias: 00/06-16-82-24 W5M | |
| Location Alias 2: 00/06-16-082-24 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 082 | |
| Meridian: 5 | |
| Range: 24 | |
| Section: 16 | |
| County/Municipality: Municipal District of Peace No. 135 | |
| Well Name: RMP BERWYN 6-16-82-24 | |
| Operator Name: Tangle Creek Energy Ltd. | |
| License Number: 0352703 | |
| License Date: 2006-02-23 | |
| License Status: Abandoned | |
| Spud Date: 2006-06-07 | |
| Final Drill Date: 2006-06-11 | |
| Well Total Depth: 885.00 m | |
| Surface Hole Latitude: 56.108504 | |
| Surface Hole Longitude: -117.698190 |
| Date | Event |
|---|---|
| 2006-02-23 | Obtained License |
| 2006-06-09 | Surface Casing Operation Performed |
| 2006-06-11 | Finished Drilling |
| 2006-06-11 | Well Log Performed |
| 2006-06-11 | Well Mode changed to Drilled and Cased |
| 2006-06-12 | Production Casing Operation Performed |
| 2006-06-12 | Rig Released |
| 2006-09-30 | Perforation Treatment Performed - Jet Perforation |
| 2006-10-08 | Perforation Treatment Performed - Jet Perforation |
| 2006-12-08 | Well Began Production |
| 2006-12-08 | Well Fluid changed to Gas |
| 2006-12-08 | Well Mode changed to Flowing |
| 2010-05-01 | Well Fluid changed to Gas |
| 2010-05-01 | Well Mode changed to Suspended |
| 2012-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-09-13 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
| 2012-09-13 | Plug Back Performed |
| 2012-09-13 | Well Fluid changed to Gas |
| 2012-09-13 | Well Mode changed to Abandoned Zone |
| 2012-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-09-14 | Plug Back Performed |
| 2012-09-14 | Well Log Performed |
| 2012-09-15 | Well Abandoned |
| 2012-09-15 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-09-30 | Perforation | 863.50 | 865.00 | 17 |
| 2006-09-30 | Perforation | 853.00 | 854.50 | 17 |
| 2006-10-08 | Perforation | 774.00 | 776.00 | 17 |
| 2006-10-08 | Perforation | 768.00 | 769.00 | 17 |
| 2006-10-08 | Perforation | 762.00 | 765.00 | 17 |
| 2012-09-13 | Packing Dev Cpd w/Res-Gyp Cem | 859.00 | 862.00 | 0 |
| 2012-09-13 | Packing Device Capped w/Cement | 842.00 | 850.00 | 0 |
| 2012-09-14 | Packing Device Capped w/Cement | 752.00 | 760.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 744 | 0.0 | 0.0 | 0.0 |
| 2007 | 8732 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 2903 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-09-15 | No Incident Encountered | 0.00 | 0.00 |
| 2012-09-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]