X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0826020709000

Well Details

Well ID: 0826020709000
Loading map...
Location: 00/09-07-082-02W6/0
Location Alias: 00/09-07-82-02 W6M
Location Alias 2: 00/09-07-082-02 W6/00
Country: Canada
Province: Alberta
Township: 082
Meridian: 6
Range: 02
Section: 07
County/Municipality: Municipal District of Fairview No. 136
Well Name: CVE GAGE 9-7-82-2
Operator Name: Cenovus Energy Inc.
License Number: 0208237
License Date: 1997-11-10
License Status: RecCertified
Spud Date: 1997-11-16
Final Drill Date: 1997-12-03
Well Total Depth: 2300.00 m
Surface Hole Latitude: 56.096123
Surface Hole Longitude: -118.290741

For data sources see[1][2]

Well History

Date Event
1997-11-10 Obtained License
1997-11-16 Lost Circulation Occurred
1997-11-17 Surface Casing Operation Performed
1997-12-03 Finished Drilling
1997-12-03 Well Log Performed
1997-12-04 Drill Stem Test Performed
1997-12-05 Drill Stem Test Performed
1997-12-06 Drill Stem Test Performed
1997-12-08 Drill Stem Test Performed
1997-12-08 Kick Occurred
1997-12-09 Production Casing Operation Performed
1997-12-09 Rig Released
1997-12-09 Well Mode changed to Drilled and Cased
2005-03-25 Well Log Performed
2005-09-05 Well Log Performed
2005-09-21 Well Log Performed
2005-09-22 Perforation Treatment Performed - Abrasa-Jet Perforation
2005-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-09-24 Perforation Treatment Performed - Cement Plug
2005-09-24 Perforation Treatment Performed - Remedial Casing
2005-09-25 Well Log Performed
2005-09-26 Perforation Treatment Performed - Abrasa-Jet Perforation
2005-09-27 Perforation Treatment Performed - Remedial Casing
2005-09-28 Well Log Performed
2005-09-29 Well Log Performed
2005-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-02 Perforation Treatment Performed - Jet Perforation
2005-10-02 Well Log Performed
2005-10-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2005-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-06 Perforation Treatment Performed - Remedial Casing
2005-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-07 Perforation Treatment Performed - Jet Perforation
2005-10-07 Well Log Performed
2005-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-09 Perforation Treatment Performed - Jet Perforation
2005-10-09 Well Log Performed
2005-10-10 Perforation Treatment Performed - Remedial Casing
2005-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-11 Well Log Performed
2005-10-12 Perforation Treatment Performed - Jet Perforation
2005-10-12 Well Log Performed
2005-10-13 Perforation Treatment Performed - Remedial Casing
2005-10-14 Perforation Treatment Performed - Jet Perforation
2005-10-14 Well Log Performed
2005-10-15 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2005-10-15 Perforation Treatment Performed - Remedial Casing
2005-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-16 Well Log Performed
2006-02-21 Well Abandoned
2006-02-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-22 Hydra Jet Perforation 1052.00 1056.00 99
2005-10-04 Acid Treatment 447.00 452.00 0
2005-10-06 Remedial Casing Cementing 447.00 452.00 0
2005-10-07 Packing Device Capped w/Cement 434.30 443.30 0
2005-10-07 Perforation 428.50 429.50 7
2005-10-08 Acid Treatment 428.50 429.50 0
2005-10-09 Packing Device Capped w/Cement 414.00 423.00 0
2005-10-09 Perforation 397.00 398.00 11
2005-10-10 Remedial Casing Cementing 397.00 398.00 0
2005-10-11 Packing Device Capped w/Cement 382.60 391.60 0
2005-10-12 Perforation 376.00 379.00 17
2005-09-23 Acid Treatment 1052.00 1056.00 0
2005-10-13 Remedial Casing Cementing 376.00 379.00 0
2005-10-14 Perforation 362.00 365.00 17
2005-10-15 Packing Dev Cpd w/Res-Gyp Cem 371.50 375.00 0
2005-10-15 Remedial Casing Cementing 362.00 365.00 0
2005-10-16 Packing Device Capped w/Cement 352.00 360.00 0
2005-09-24 Remedial Casing Cementing 1052.00 1056.00 0
2005-09-24 Cement Plug 793.40 1052.00 0
2005-09-26 Hydra Jet Perforation 502.00 506.00 99
2005-09-27 Remedial Casing Cementing 502.00 506.00 0
2005-10-01 Packing Device Capped w/Cement 487.00 495.00 0
2005-10-02 Perforation 448.00 449.00 7
2005-10-03 Hydra Jet Perforation 447.00 452.00 99

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-11-16 Lost Circulation 20.00 43.00
1997-12-08 Kick 2300.00 2300.00

For data sources see[5]

References