If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0826050606002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.076634,"lon":-118.77484,"icon":""}]} |
| Location: 00/06-06-082-05W6/2 | |
| Location Alias: 00/06-06-82-05 W6M | |
| Location Alias 2: 00/06-06-082-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 082 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 06 | |
| County/Municipality: Municipal District of Fairview No. 136 | |
| Well Name: CEQUENCE GEORGE 6-6-82-5 | |
| Operator Name: Cequence Energy Ltd. | |
| License Number: 0047959 | |
| License Date: 1973-11-08 | |
| License Status: Suspension | |
| Spud Date: 1973-11-08 | |
| Final Drill Date: 1973-11-27 | |
| Well Total Depth: 1664.20 m | |
| Surface Hole Latitude: 56.076634 | |
| Surface Hole Longitude: -118.774840 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1973-11-08 | Lost Circulation Occurred |
| 1973-11-08 | Obtained License |
| 1973-11-11 | Lost Circulation Occurred |
| 1973-11-15 | Drill Stem Test Performed |
| 1973-11-27 | Finished Drilling |
| 1973-11-27 | Well Log Performed |
| 1973-11-29 | Drill Stem Test Performed |
| 1973-11-30 | Drill Stem Test Performed |
| 1973-12-01 | Drill Stem Test Performed |
| 1973-12-02 | Production Casing Operation Performed |
| 1973-12-23 | Perforation Treatment Performed - Jet Perforation |
| 1973-12-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-01-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-01-07 | Perforation Treatment Performed - Fractured |
| 1974-01-11 | Perforation Treatment Performed - Jet Perforation |
| 1974-01-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-01-18 | Perforation Treatment Performed - Jet Perforation |
| 1974-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-01-20 | Perforation Treatment Performed - Cement Squeeze |
| 1974-02-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-02-17 | Well Mode changed to Drilled and Cased |
| 1978-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-10-01 | Well Began Production |
| 1980-10-01 | Well Fluid changed to Gas |
| 1980-10-01 | Well Mode changed to Flowing |
| 1984-08-01 | Well Fluid changed to Gas |
| 1984-08-01 | Well Mode changed to Suspended |
| 1988-10-01 | Well Fluid changed to Gas |
| 1988-10-01 | Well Mode changed to Flowing |
| 1989-10-01 | Well Fluid changed to Gas |
| 1989-10-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1973-12-23 | Perforation | 1515.50 | 1517.90 | 7 |
| 1974-02-16 | Acid Treatment | 1473.70 | 1475.50 | 0 |
| 1978-06-28 | Acid Treatment | 1515.50 | 1517.90 | 0 |
| 1973-12-31 | Acid Treatment | 1515.50 | 1517.90 | 0 |
| 1974-01-03 | Acid Treatment | 1515.50 | 1517.90 | 0 |
| 1974-01-07 | Fracture | 1515.50 | 1517.90 | 0 |
| 1974-01-11 | Perforation | 957.70 | 962.60 | 7 |
| 1974-01-14 | Acid Treatment | 957.70 | 962.60 | 0 |
| 1974-01-18 | Perforation | 1473.70 | 1475.50 | 7 |
| 1974-01-19 | Acid Treatment | 1473.70 | 1475.50 | 0 |
| 1974-01-20 | Cement Squeeze | 957.70 | 962.60 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1980 | 1534 | 0.0 | 0.0 | 0.0 |
| 1981 | 1408 | 0.0 | 0.0 | 0.0 |
| 1983 | 1535 | 0.0 | 0.0 | 0.0 |
| 1988 | 809 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1973-11-08 | Lost Circulation | 30.80 | 30.80 |
| 1973-11-11 | Lost Circulation | 239.00 | 239.00 |
For data sources see[6]