X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0834051212002

Well Details

Well ID: 0834051212002
Loading map...
Location: 00/12-12-083-05W4/2
Location Alias: 00/12-12-83-05 W4M
Location Alias 2: 00/12-12-083-05 W4/02
Country: Canada
Province: Alberta
Township: 083
Meridian: 4
Range: 05
Section: 12
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC NEWBY 12-12-83-5
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0143552
License Date: 1990-03-02
License Status: Abandoned
Spud Date: 1990-03-10
Final Drill Date: 1990-03-11
Well Total Depth: 264.00 m
Surface Hole Latitude: 56.184267
Surface Hole Longitude: -110.659310

For data sources see[1][2]

Well History

Date Event
1990-03-02 Obtained License
1990-03-10 Surface Casing Operation Performed
1990-03-11 Finished Drilling
1990-03-11 Perforation Treatment Performed - Open-Hole Completion
1990-03-11 Production Casing Operation Performed
1990-03-11 Well Log Performed
1990-03-12 Rig Released
1990-03-24 Well Log Performed
1990-03-25 Perforation Treatment Performed - Jet Perforation
1990-03-25 Well Mode changed to Drilled and Cased
1991-04-09 Well Began Production
1991-04-09 Well Fluid changed to Gas
1991-04-09 Well Mode changed to Flowing
1997-03-01 Well Fluid changed to Gas
1997-03-01 Well Mode changed to Suspended
1998-01-06 Well Fluid changed to Gas
1998-01-06 Well Mode changed to Flowing
2006-01-06 Well Fluid changed to Gas
2006-01-06 Well Mode changed to Suspended
2014-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-20 Plug Back Performed
2014-01-24 Perforation Treatment Performed - Cement Plug
2014-01-24 Plug Back Performed
2014-01-24 Well Fluid changed to Gas
2014-01-24 Well Mode changed to Abandoned Zone
2014-02-11 Well Abandoned
2014-02-11 Well Fluid changed to Gas
2014-02-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-11 Open Hole/Barefoot Completion 263.00 264.00 0
1990-03-25 Perforation 195.50 199.00 13
2014-01-20 Packing Device Capped w/Cement 196.00 252.00 0
2014-01-24 Cement Plug 26.00 196.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 5417 0.0 0.0 0.0
1992 8418 0.0 0.0 0.0
1993 8501 0.0 0.0 0.0
1994 1857 0.0 0.0 0.0
1998 8143 0.0 0.0 0.0
1999 7878 0.0 0.0 0.0
2000 2476 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References