X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0834060208000

Well Details

Well ID: 0834060208000
Loading map...
Location: 00/08-02-083-06W4/0
Location Alias: 00/08-02-83-06 W4M
Location Alias 2: 00/08-02-083-06 W4/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 4
Range: 06
Section: 02
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC 100 NEWBY 8-2-83-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0143373
License Date: 1990-02-22
License Status: Suspension
Spud Date: 1990-03-12
Final Drill Date: 1990-03-13
Well Total Depth: 294.00 m
Surface Hole Latitude: 56.165340
Surface Hole Longitude: -110.825379

For data sources see[1][2]

Well History

Date Event
1990-02-22 Obtained License
1990-03-12 Surface Casing Operation Performed
1990-03-12 Well Log Performed
1990-03-13 Finished Drilling
1990-03-13 Production Casing Operation Performed
1990-03-13 Rig Released
1990-03-13 Well Log Performed
1990-03-25 Well Log Performed
1990-03-26 Perforation Treatment Performed - Jet Perforation
1990-03-26 Well Mode changed to Drilled and Cased
1991-04-09 Well Began Production
1991-04-09 Well Fluid changed to Gas
1991-04-09 Well Mode changed to Flowing
1992-10-01 Well Log Performed
1992-10-21 Well Log Performed
1997-03-01 Well Fluid changed to Gas
1997-03-01 Well Mode changed to Suspended
1999-01-25 Well Log Performed
2020-02-17 Perforation Treatment Performed - Cement Plug
2020-02-17 Plug Back Performed
2020-02-17 Well Fluid changed to Gas
2020-02-17 Well Mode changed to Abandoned Zone
2020-02-18 Perforation Treatment Performed - Cement Plug
2020-02-18 Plug Back Performed
2020-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-03-07 Perforation Treatment Performed - Jet Perforation
2020-03-08 Perforation Treatment Performed - Bridge Plug No Cement Required
2020-03-08 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-03-26 Perforation 216.00 217.50 13
2020-02-17 Cement Plug 138.00 268.00 0
2020-02-18 Cement Plug 53.50 138.00 0
2020-03-07 Perforation 47.50 48.50 18
2020-03-07 Acid Treatment 47.50 48.50 0
2020-03-08 Remedial Casing Cementing 47.50 48.50 0
2020-03-08 Bridge Plug, No Cement 44.80 45.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 5130 0.0 0.0 0.0
1992 6559 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-11 No Incident Encountered 0.00 0.00
2020-02-18 No Incident Encountered 0.00 0.00
2020-03-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References