X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0834062606070

Well Details

Well ID: 0834062606070
Loading map...
Location: 07/06-26-083-06W4/0
Location Alias: 07/06-26-83-06 W4M
Location Alias 2: 07/06-26-083-06 W4/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 4
Range: 06
Section: 26
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC HZ 2632P08 NEWBY 6-26-83-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0443479
License Date: 2012-01-30
License Status: Amended
Spud Date: 2012-04-08
Final Drill Date: 2012-05-12
Well Total Depth: 1595.00 m
Surface Hole Latitude: 56.216695
Surface Hole Longitude: -110.859266

For data sources see[1][2]

Well History

Date Event
2012-01-30 Obtained License
2012-04-08 Well Mode changed to Preset
2012-04-09 Surface Casing Operation Performed
2012-04-10 Direction Drilling Operation Performed - Deviate
2012-04-10 Well Log Performed
2012-04-11 Direction Drilling Operation Performed - Horizontal
2012-04-12 Well Log Performed
2012-04-13 Intermediate Casing Operation Performed
2012-04-18 Well Log Performed
2012-05-01 Well Log Performed
2012-05-12 Finished Drilling
2012-05-12 Well Log Performed
2012-05-12 Well Mode changed to Drilled and Cased
2012-05-14 Liner Casing Operation Performed
2012-05-14 Perforation Treatment Performed - Open-Hole Completion
2012-05-14 Perforation Treatment Performed - Slotted Liner or Casing
2012-05-15 Rig Released
2015-09-01 Well Began Production
2015-09-01 Well Type changed to Steam Assisted Gravity Drain
2017-03-29 Well Log Performed
2017-03-31 Well Log Performed
2018-04-04 Well Log Performed
2018-07-11 Perforation Treatment Performed - Bridge Plug No Cement Required
2018-07-11 Well Mode changed to Abandoned and Whipstocked
2018-07-11 Well Type changed to Steam Assisted Gravity Drain
2018-07-29 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-06 T.d. Drilling Inc. 57 N/A Drill To LD
2012-04-08 Akita Drilling Ltd. 57 N/A Set Surface
2012-04-10 Trinidad Drilling Ltd. 57 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-04-10 127.00 Deviate (5 - 79 degrees)
2012-04-11 487.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-14 Open Hole/Barefoot Completion 1590.00 1595.00 0
2012-05-14 Slotted Liner 575.00 1590.00 0
2018-07-11 Bridge Plug, No Cement 487.00 487.50 0
2018-07-11 Bridge Plug, No Cement 473.00 473.50 0
2018-07-11 Bridge Plug, No Cement 466.30 471.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2784 0.0 0.0 0.0
2016 7597 0.0 0.0 0.0
2017 8550 0.0 0.0 0.0
2018 1716 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-09 No Incident Encountered 0.00 0.00
2012-05-15 No Incident Encountered 0.00 0.00
2018-07-22 No Incident Encountered 0.00 0.00

For data sources see[8]

References