X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0834062612050

Well Details

Well ID: 0834062612050
Loading map...
Location: 05/12-26-083-06W4/0
Location Alias: 05/12-26-83-06 W4M
Location Alias 2: 05/12-26-083-06 W4/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 4
Range: 06
Section: 26
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC HZ 2632P02 NEWBY 12-26-83-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0443148
License Date: 2012-01-20
License Status: Amended
Spud Date: 2012-07-13
Final Drill Date: 2012-08-22
Well Total Depth: 1686.00 m
Surface Hole Latitude: 56.218395
Surface Hole Longitude: -110.860999

For data sources see[1][2]

Well History

Date Event
2012-01-20 Obtained License
2012-07-13 Well Mode changed to Preset
2012-07-14 Surface Casing Operation Performed
2012-07-29 Direction Drilling Operation Performed - Deviate
2012-07-29 Well Log Performed
2012-07-30 Direction Drilling Operation Performed - Horizontal
2012-07-30 Well Log Performed
2012-07-31 Intermediate Casing Operation Performed
2012-08-13 Well Log Performed
2012-08-21 Well Log Performed
2012-08-22 Finished Drilling
2012-08-22 Liner Casing Operation Performed
2012-08-22 Perforation Treatment Performed - Open-Hole Completion
2012-08-22 Perforation Treatment Performed - Slotted Liner or Casing
2012-08-22 Rig Released
2012-08-22 Well Mode changed to Drilled and Cased
2015-09-01 Well Began Production
2015-09-01 Well Type changed to Steam Assisted Gravity Drain
2017-01-26 Well Log Performed
2019-07-29 Perforation Treatment Performed - Bridge Plug No Cement Required

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-13 Trinidad Drilling Ltd. 57 N/A Set Surface
2012-08-20 T.d. Drilling Inc. 57 1663 Resumption
2012-07-29 Trinidad Drilling Ltd. 57 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-29 140.20 Deviate (5 - 79 degrees)
2012-07-30 424.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-22 Open Hole/Barefoot Completion 1680.00 1686.00 0
2012-08-22 Slotted Liner 679.00 1680.00 0
2019-07-29 Bridge Plug, No Cement 582.00 582.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2783 0.0 0.0 0.0
2016 7665 0.0 0.0 0.0
2017 8690 0.0 0.0 0.0
2018 7271 0.0 0.0 0.0
2020 11 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-14 No Incident Encountered 0.00 0.00
2012-08-22 No Incident Encountered 0.00 0.00
2019-07-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References