X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0834062713120

Well Details

Well ID: 0834062713120
Loading map...
Location: 12/13-27-083-06W4/0
Location Alias: 12/13-27-83-06 W4M
Location Alias 2: 12/13-27-083-06 W4/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 4
Range: 06
Section: 27
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC HZ 2631P11 NEWBY 13-27-83-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0450154
License Date: 2012-11-15
License Status: Amended
Spud Date: 2013-02-14
Final Drill Date: 2013-03-06
Well Total Depth: 1823.00 m
Surface Hole Latitude: 56.218687
Surface Hole Longitude: -110.862522

For data sources see[1][2]

Well History

Date Event
2012-11-15 Obtained License
2013-02-14 Surface Casing Operation Performed
2013-02-16 Direction Drilling Operation Performed - Deviate
2013-02-17 Direction Drilling Operation Performed - Horizontal
2013-02-17 Well Log Performed
2013-02-18 Intermediate Casing Operation Performed
2013-03-01 Well Log Performed
2013-03-06 Finished Drilling
2013-03-06 Well Log Performed
2013-03-06 Well Mode changed to Drilled and Cased
2013-03-08 Liner Casing Operation Performed
2013-03-08 Perforation Treatment Performed - Open-Hole Completion
2013-03-08 Perforation Treatment Performed - Slotted Liner or Casing
2013-03-08 Rig Released
2015-09-06 Well Began Production
2015-09-06 Well Type changed to Steam Assisted Gravity Drain
2018-05-03 Well Log Performed
2018-05-04 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-04 Trinidad Drilling Ltd. 57 N/A Drill To LD
2013-02-14 Trinidad Drilling Ltd. 57 N/A Set Surface
2013-02-16 Trinidad Drilling Ltd. 57 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-16 121.40 Deviate (5 - 79 degrees)
2013-02-17 573.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-08 Slotted Liner 722.20 1815.00 0
2013-03-08 Open Hole/Barefoot Completion 1815.00 1823.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2721 0.0 0.0 0.0
2016 7586 0.0 0.0 0.0
2017 8755 0.0 0.0 0.0
2018 8477 0.0 0.0 0.0
2019 7370 0.0 0.0 0.0
2020 1601 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-08 No Incident Encountered 0.00 0.00

For data sources see[8]

References