If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0834072310040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.202623,"lon":-111.008079,"icon":""}]} |
Location: 04/10-23-083-07W4/0 | |
Location Alias: 04/10-23-83-07 W4M | |
Location Alias 2: 04/10-23-083-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 083 | |
Meridian: 4 | |
Range: 07 | |
Section: 23 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: COPRC HZ 103I07 RESDELN 10-23-83-7 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0458680 | |
License Date: 2013-08-20 | |
License Status: Issued | |
Spud Date: 2013-10-08 | |
Final Drill Date: 2014-03-15 | |
Well Total Depth: 1677.00 m | |
Surface Hole Latitude: 56.202623 | |
Surface Hole Longitude: -111.008079 |
Date | Event |
---|---|
2013-08-20 | Obtained License |
2013-10-08 | Surface Casing Operation Performed |
2013-10-08 | Well Mode changed to Preset |
2014-02-23 | Direction Drilling Operation Performed - Deviate |
2014-02-25 | Direction Drilling Operation Performed - Horizontal |
2014-02-26 | Intermediate Casing Operation Performed |
2014-03-15 | Finished Drilling |
2014-03-15 | Well Log Performed |
2014-03-15 | Well Mode changed to Drilled and Cased |
2014-03-16 | Liner Casing Operation Performed |
2014-03-16 | Perforation Treatment Performed - Open-Hole Completion |
2014-03-16 | Perforation Treatment Performed - Slotted Liner or Casing |
2014-03-16 | Rig Released |
2015-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-09-15 | Well Began Production |
2015-09-15 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-10-08 | Superior Drilling & Coring | 2 | N/A | Set Surface |
2014-03-13 | Precision Drilling Corporation | 623 | 1657 | Resumption |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-23 | 208.90 | Deviate (5 - 79 degrees) |
2014-02-25 | 569.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-16 | Open Hole/Barefoot Completion | 1672.00 | 1677.00 | 0 |
2014-03-16 | Slotted Liner | 653.00 | 1672.00 | 0 |
2015-06-14 | Acid Treatment | 653.00 | 1677.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-10-09 | No Incident Encountered | 0.00 | 0.00 |
2014-03-16 | No Incident Encountered | 0.00 | 0.00 |
2015-07-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]