X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0834072404AB0

Well Details

Well ID: 0834072404AB0
Loading map...
Location: AB/04-24-083-07W4/0
Location Alias: AB/04-24-83-07 W4M
Location Alias 2: AB/04-24-083-07 W4/00
Country: Canada
Province: Alberta
Township: 083
Meridian: 4
Range: 07
Section: 24
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC HZ S3 RESDELN 4-24-83-7
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0232606
License Date: 2000-01-25
License Status: Abandoned
Spud Date: 2000-03-16
Final Drill Date: 2000-03-26
Well Total Depth: 1334.00 m
Surface Hole Latitude: 56.214381
Surface Hole Longitude: -110.968892

For data sources see[1][2]

Well History

Date Event
2000-01-25 Obtained License
2000-03-16 Direction Drilling Operation Performed - Horizontal
2000-03-19 Intermediate Casing Operation Performed
2000-03-26 Finished Drilling
2000-03-26 Perforation Treatment Performed - Open-Hole Completion
2000-03-26 Perforation Treatment Performed - Slotted Liner or Casing
2000-03-26 Rig Released
2000-03-26 Well Mode changed to Drilled and Cased
2000-03-28 Liner Casing Operation Performed
2001-01-01 Well Began Injection
2001-01-01 Well Fluid changed to Steam
2001-01-01 Well Type changed to Injection
2016-09-08 Well Log Performed
2016-09-09 Well Log Performed
2016-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-12-01 Well Fluid changed to Steam
2016-12-01 Well Mode changed to Suspended
2016-12-01 Well Type changed to Injection
2019-09-08 Perforation Treatment Performed - Cement Plug
2019-09-08 Plug Back Performed
2019-09-08 Well Fluid changed to Steam
2019-09-08 Well Mode changed to Abandoned Zone
2019-09-08 Well Type changed to Injection
2019-09-12 Well Abandoned
2019-09-12 Well Fluid changed to Steam
2019-09-12 Well Mode changed to Abandoned
2019-09-12 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-03-16 59.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-26 Slotted Liner 576.10 1329.00 0
2000-03-26 Open Hole/Barefoot Completion 1329.00 1334.00 0
2016-11-16 Packing Device Capped w/Cement 297.00 382.80 0
2019-09-08 Cement Plug 15.00 302.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-16 No Incident Encountered 0.00 0.00
2019-09-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References