If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0844040302F10 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.246584,"lon":-110.542508,"icon":""}]} |
Location: F1/02-03-084-04W4/0 | |
Location Alias: F1/02-03-84-04 W4M | |
Location Alias 2: F1/02-03-084-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 084 | |
Meridian: 4 | |
Range: 04 | |
Section: 03 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: COPRC 1F1 NEWBY 2-3-84-4 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0426382 | |
License Date: 2010-11-26 | |
License Status: Issued | |
Spud Date: 2011-01-27 | |
Final Drill Date: 2011-01-29 | |
Well Total Depth: 184.00 m | |
Surface Hole Latitude: 56.246584 | |
Surface Hole Longitude: -110.542508 |
Date | Event |
---|---|
2010-11-26 | Obtained License |
2011-01-27 | Surface Casing Operation Performed |
2011-01-27 | Well Log Performed |
2011-01-29 | Finished Drilling |
2011-01-29 | Well Log Performed |
2011-01-29 | Well Mode changed to Drilled and Cased |
2011-01-30 | Well Log Performed |
2011-01-31 | Plug Back Performed |
2011-02-02 | Intermediate Casing Operation Performed |
2011-02-03 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-04 | Rig Released |
2011-03-01 | Well Type changed to Observation |
2015-08-23 | Well Began Production |
2015-08-23 | Well Fluid changed to Water |
2015-08-23 | Well Type changed to Source |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-03 | Open Hole/Barefoot Completion | 135.00 | 169.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 275 | 0.0 | 0.0 | 0.0 |
2016 | 2599 | 0.0 | 0.0 | 0.0 |
2017 | 1988 | 0.0 | 0.0 | 0.0 |
2018 | 4357 | 0.0 | 0.0 | 0.0 |
2019 | 5447 | 0.0 | 0.0 | 0.0 |
2020 | 1423 | 0.0 | 0.0 | 0.0 |
For data sources see[5]