X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0844060204030

Well Details

Well ID: 0844060204030
Loading map...
Location: 03/04-02-084-06W4/0
Location Alias: 03/04-02-84-06 W4M
Location Alias 2: 03/04-02-084-06 W4/00
Country: Canada
Province: Alberta
Township: 084
Meridian: 4
Range: 06
Section: 02
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: COPRC HZ 2622P12 NEWBY 4-2-84-6
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0466841
License Date: 2014-05-27
License Status: Amended
Spud Date: 2014-06-22
Final Drill Date: 2014-08-20
Well Total Depth: 1578.00 m
Surface Hole Latitude: 56.239812
Surface Hole Longitude: -110.864176

For data sources see[1][2]

Well History

Date Event
2014-05-27 Obtained License
2014-06-22 Well Mode changed to Preset
2014-06-23 Surface Casing Operation Performed
2014-07-19 Direction Drilling Operation Performed - Deviate
2014-07-19 Direction Drilling Operation Performed - Horizontal
2014-07-20 Intermediate Casing Operation Performed
2014-07-20 Well Log Performed
2014-08-01 Well Log Performed
2014-08-20 Finished Drilling
2014-08-20 Well Log Performed
2014-08-20 Well Mode changed to Drilled and Cased
2014-08-21 Liner Casing Operation Performed
2014-08-21 Perforation Treatment Performed - Open-Hole Completion
2014-08-21 Perforation Treatment Performed - Slotted Liner or Casing
2014-08-21 Rig Released
2016-06-29 Well Began Production
2016-06-29 Well Type changed to Steam Assisted Gravity Drain
2017-04-29 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-08-19 Akita Drilling Ltd. 22 1607 Resumption
2014-06-22 Precision Drilling Corporation 140 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-07-19 125.60 Deviate (5 - 79 degrees)
2014-07-19 481.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-08-21 Slotted Liner 610.00 1568.00 0
2014-08-21 Open Hole/Barefoot Completion 1568.00 1578.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 3987 0.0 0.0 0.0
2017 8483 0.0 0.0 0.0
2018 8707 0.0 0.0 0.0
2019 7887 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-06-23 No Incident Encountered 0.00 0.00
2014-08-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References