X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0845141611020

Well Details

Well ID: 0845141611020
Loading map...
Location: 02/11-16-084-14W5/0
Location Alias: 02/11-16-84-14 W5M
Location Alias 2: 02/11-16-084-14 W5/00
Country: Canada
Province: Alberta
Township: 084
Meridian: 5
Range: 14
Section: 16
County/Municipality: Northern Sunrise County
Well Name: SUMMERLAND SLAVE 11-16-84-14
Operator Name: Summerland Energy Inc.
License Number: 0218790
License Date: 1998-11-19
License Status: Issued
Spud Date: 1998-11-24
Final Drill Date: 1998-11-25
Well Total Depth: 600.00 m
Surface Hole Latitude: 56.286078
Surface Hole Longitude: -116.152817

For data sources see[1][2]

Well History

Date Event
1998-11-19 Obtained License
1998-11-24 Surface Casing Operation Performed
1998-11-25 Finished Drilling
1998-11-25 Well Mode changed to Drilled and Cased
1998-11-26 Production Casing Operation Performed
1998-11-26 Rig Released
1998-11-26 Well Log Performed
1998-12-06 Perforation Treatment Performed - Jet Perforation
1998-12-06 Well Log Performed
1998-12-09 Perforation Treatment Performed - Chemical Squeeze
1998-12-23 Well Began Production
1998-12-23 Well Fluid changed to Gas
1998-12-23 Well Mode changed to Flowing
2003-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-09-01 Well Fluid changed to Gas
2018-09-01 Well Mode changed to Suspended
2018-09-02 Well Fluid changed to Gas
2018-09-02 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-12-06 Perforation 533.00 537.00 13
1998-12-09 Chemical Squeeze 533.00 537.00 0
2003-06-08 Acid Treatment 533.00 537.00 0
2003-11-22 Acid Treatment 533.00 537.00 0
2004-07-14 Acid Treatment 533.00 537.00 0
2006-06-29 Acid Treatment 533.00 537.00 0
2009-03-13 Acid Treatment 533.00 537.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 210 0.0 0.0 0.0
1999 8055 0.0 0.0 0.0
2000 8747 0.0 0.0 0.0
2001 8430 0.0 0.0 0.0
2002 8112 0.0 0.0 0.0
2003 8410 0.0 0.0 0.0
2004 8246 0.0 0.0 0.0
2005 7316 0.0 0.0 0.0
2006 8159 0.0 0.0 0.0
2007 7929 0.0 0.0 0.0
2008 7152 0.0 0.0 0.0
2009 8024 0.0 0.0 0.0
2010 8201 0.0 0.0 0.0
2011 8080 0.0 0.0 0.0
2012 7531 0.0 0.0 0.0
2013 7648 0.0 0.0 0.0
2014 8335 0.0 0.0 0.0
2015 8377 0.0 0.0 0.0
2016 8703 0.0 0.0 0.0
2017 5634 0.0 0.0 0.0
2018 6195 0.0 0.0 0.0
2019 7845 0.0 0.0 0.0
2020 1310 0.0 0.0 0.0

For data sources see[5]

References