X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0855091910002

Well Details

Well ID: 0855091910002
Loading map...
Location: 00/10-19-085-09W5/2
Location Alias: 00/10-19-85-09 W5M
Location Alias 2: 00/10-19-085-09 W5/02
Country: Canada
Province: Alberta
Township: 085
Meridian: 5
Range: 09
Section: 19
County/Municipality: Swampy Lake 236
Well Name: SUMMERLAND LOON 10-19-85-9
Operator Name: Summerland Energy Inc.
License Number: 0030174
License Date: 1966-03-04
License Status: Suspension
Spud Date: 1966-03-05
Final Drill Date: 1966-03-30
Well Total Depth: 1507.20 m
Surface Hole Latitude: 56.386434
Surface Hole Longitude: -115.408140

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-03-04 Obtained License
1966-03-23 Drill Stem Test Performed
1966-03-29 Drill Stem Test Performed
1966-03-30 Finished Drilling
1966-03-30 Well Mode changed to Drilled and Cased
1966-03-31 Production Casing Operation Performed
1966-06-07 Perforation Treatment Performed - Jet Perforation
1966-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-24 Perforation Treatment Performed - Bullet Perforation
1966-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-25 Perforation Treatment Performed - Fractured
1966-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-29 Perforation Treatment Performed - Bullet Perforation
1966-09-29 Perforation Treatment Performed - Fractured
1966-11-01 Well Began Production
1966-11-01 Well Fluid changed to Crude Oil
1966-11-01 Well Mode changed to Pumping
1970-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-24 Perforation Treatment Performed - Acid Wash - No Pressure
1993-11-01 Well Fluid changed to Crude Oil
1993-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-07 Perforation 1490.50 1492.30 7
1966-09-29 Acid Treatment 1380.10 1390.50 0
1966-09-29 Fracture 1380.10 1390.50 0
1970-01-24 Acid Wash 1380.10 1390.50 0
1970-01-24 Acid Treatment 1380.10 1390.50 0
1966-06-11 Acid Treatment 1490.50 1492.30 0
1966-09-24 Bullet Perforation 1490.50 1492.30 3
1966-09-24 Acid Treatment 1490.50 1492.30 0
1966-09-25 Acid Treatment 1490.50 1492.30 0
1966-09-25 Fracture 1490.50 1492.30 0
1966-09-29 Bullet Perforation 1380.10 1382.00 3
1966-09-29 Bullet Perforation 1383.50 1386.20 3
1966-09-29 Bullet Perforation 1389.30 1390.50 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 3095 0.0 0.0 0.0
1968 7769 0.0 0.0 0.0
1969 7776 0.0 0.0 0.0
1970 8231 0.0 0.0 0.0
1971 8544 0.0 0.0 0.0
1972 8558 0.0 0.0 0.0
1973 3219 0.0 0.0 0.0
1974 8628 0.0 0.0 0.0
1975 8150 0.0 0.0 0.0
1976 8325 0.0 0.0 0.0
1977 8336 0.0 0.0 0.0
1978 8176 0.0 0.0 0.0
1979 6698 0.0 0.0 0.0
1980 8541 0.0 0.0 0.0
1981 7314 0.0 0.0 0.0
1982 7116 0.0 0.0 0.0
1983 5567 0.0 0.0 0.0
1984 6456 0.0 0.0 0.0
1985 8111 0.0 0.0 0.0
1986 8357 0.0 0.0 0.0
1987 7796 0.0 0.0 0.0
1988 7599 0.0 0.0 0.0
1989 6813 0.0 0.0 0.0
1990 8255 0.0 0.0 0.0
1991 8471 0.0 0.0 0.0
1992 8528 0.0 0.0 0.0
1993 5463 0.0 0.0 0.0

For data sources see[5]

References