X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0864060709000

Well Details

Well ID: 0864060709000
Loading map...
Location: 00/09-07-086-06W4/0
Location Alias: 00/09-07-86-06 W4M
Location Alias 2: 00/09-07-086-06 W4/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 4
Range: 06
Section: 07
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: NEXEN OPTI OBS NEWBY 9-7-86-6
Operator Name: CNOOC Petroleum North America ULC
License Number: 0429878
License Date: 2011-01-12
License Status: RecCertified
Spud Date: 2011-01-23
Final Drill Date: 2011-01-25
Well Total Depth: 250.00 m
Surface Hole Latitude: 56.445668
Surface Hole Longitude: -110.933959

For data sources see[1][2]

Well History

Date Event
2011-01-12 Obtained License
2011-01-23 Surface Casing Operation Performed
2011-01-25 Finished Drilling
2011-01-25 Well Log Performed
2011-01-25 Well Mode changed to Drilled and Cased
2011-01-26 Production Casing Operation Performed
2011-01-26 Rig Released
2011-02-22 Well Log Performed
2011-03-02 Perforation Treatment Performed - Fractured
2011-03-02 Perforation Treatment Performed - Jet Perforation
2011-03-02 Well Log Performed
2011-03-03 Perforation Treatment Performed - Fractured
2011-03-03 Perforation Treatment Performed - Jet Perforation
2011-03-03 Well Log Performed
2011-03-05 Well Log Performed
2012-03-14 Perforation Treatment Performed - Bridge Plug No Cement Required
2012-03-16 Perforation Treatment Performed - Cement Plug
2012-03-16 Plug Back Performed
2012-03-16 Well Mode changed to Abandoned Zone
2012-03-19 Well Abandoned
2012-03-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-02 Perforation 212.50 213.00 20
2011-03-02 Fracture 212.50 213.00 0
2011-03-02 Perforation 195.00 195.50 20
2011-03-02 Fracture 195.00 195.50 0
2011-03-03 Perforation 135.00 135.50 20
2011-03-03 Fracture 135.00 135.50 0
2012-03-14 Bridge Plug, No Cement 187.70 188.30 0
2012-03-16 Cement Plug 9.50 187.70 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-19 No Incident Encountered 0.00 0.00

For data sources see[5]

References