X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0865090810000

Well Details

Well ID: 0865090810000
Loading map...
Location: 00/10-08-086-09W5/0
Location Alias: 00/10-08-86-09 W5M
Location Alias 2: 00/10-08-086-09 W5/00
Country: Canada
Province: Alberta
Township: 086
Meridian: 5
Range: 09
Section: 08
County/Municipality: Swampy Lake 236
Well Name: STAR ET AL LOON 10-8-86-9
Operator Name: Harvest Operations Corp.
License Number: 0096329
License Date: 1982-06-17
License Status: Suspension
Spud Date: 1982-07-09
Final Drill Date: 1982-07-20
Well Total Depth: 1518.00 m
Surface Hole Latitude: 56.443118
Surface Hole Longitude: -115.379441

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-06-17 Obtained License
1982-07-20 Finished Drilling
1982-07-20 Well Mode changed to Drilled and Cased
1982-07-22 Drill Stem Test Performed
1982-07-23 Drill Stem Test Performed
1982-07-24 Production Casing Operation Performed
1982-07-28 Perforation Treatment Performed - Jet Perforation
1982-07-31 Perforation Treatment Performed - Jet Perforation
1982-08-01 Well Began Production
1982-08-01 Well Fluid changed to Crude Oil
1982-08-01 Well Mode changed to Flowing
1987-02-14 Perforation Treatment Performed - Jet Perforation
1987-02-14 Well Log Performed
1988-02-23 Perforation Treatment Performed - Acid Wash - No Pressure
1990-02-09 Well Fluid changed to Crude Oil
1990-02-09 Well Mode changed to Pumping
1990-02-10 Perforation Treatment Performed - Fractured
1990-08-07 Perforation Treatment Performed - Fractured
2006-05-19 Well Log Performed
2006-05-20 Perforation Treatment Performed - Jet Perforation
2006-05-20 Well Log Performed
2006-05-21 Perforation Treatment Performed - Cement Squeeze
2015-03-01 Well Fluid changed to Crude Oil
2015-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-07-28 Perforation 1497.00 1501.00 13
1982-07-31 Perforation 1481.50 1485.00 13
1987-02-14 Perforation 1479.00 1483.00 14
1988-02-23 Acid Wash 1479.00 1485.00 0
1990-02-10 Fracture 1479.00 1482.80 0
1990-08-07 Fracture 1479.00 1485.00 0
2006-05-20 Perforation 340.00 341.00 13
2006-05-21 Cement Squeeze 340.00 341.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2160 0.0 0.0 0.0
1983 3116 0.0 0.0 0.0
1984 4058 0.0 0.0 0.0
1985 6170 0.0 0.0 0.0
1986 7304 0.0 0.0 0.0
1987 7922 0.0 0.0 0.0
1988 8567 0.0 0.0 0.0
1989 8290 0.0 0.0 0.0
1990 7874 0.0 0.0 0.0
1991 7994 0.0 0.0 0.0
1992 8123 0.0 0.0 0.0
1993 7453 0.0 0.0 0.0
1994 8408 0.0 0.0 0.0
1995 7957 0.0 0.0 0.0
1996 8447 0.0 0.0 0.0
1997 6617 0.0 0.0 0.0
1998 7153 0.0 0.0 0.0
1999 7529 0.0 0.0 0.0
2000 8194 0.0 0.0 0.0
2001 7150 0.0 0.0 0.0
2002 8631 0.0 0.0 0.0
2003 8288 0.0 0.0 0.0
2004 8759 0.0 0.0 0.0
2005 8422 0.0 0.0 0.0
2006 8512 0.0 0.0 0.0
2007 8703 0.0 0.0 0.0
2008 8744 0.0 0.0 0.0
2009 8719 0.0 0.0 0.0
2010 8730 0.0 0.0 0.0
2011 8117 0.0 0.0 0.0
2012 8615 0.0 0.0 0.0
2013 567 0.0 0.0 0.0
2014 1266 0.0 0.0 0.0
2015 864 0.0 0.0 0.0

For data sources see[5]

References