If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0865092716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.477787,"lon":-115.322258,"icon":""}]} |
Location: 00/16-27-086-09W5/0 | |
Location Alias: 00/16-27-86-09 W5M | |
Location Alias 2: 00/16-27-086-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 086 | |
Meridian: 5 | |
Range: 09 | |
Section: 27 | |
County/Municipality: Northern Sunrise County | |
Well Name: PPR LOON 16-27-86-9 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0434106 | |
License Date: 2011-06-06 | |
License Status: Issued | |
Spud Date: 2011-08-08 | |
Final Drill Date: 2011-08-25 | |
Well Total Depth: 2946.00 m | |
Surface Hole Latitude: 56.477787 | |
Surface Hole Longitude: -115.322258 |
Date | Event |
---|---|
2011-06-06 | Obtained License |
2011-08-10 | Surface Casing Operation Performed |
2011-08-13 | Direction Drilling Operation Performed - Horizontal |
2011-08-15 | Well Log Performed |
2011-08-16 | Intermediate Casing Operation Performed |
2011-08-24 | Well Log Performed |
2011-08-25 | Finished Drilling |
2011-08-25 | Production Casing Operation Performed |
2011-08-25 | Well Mode changed to Drilled and Cased |
2011-08-26 | Rig Released |
2011-08-30 | Well Log Performed |
2011-09-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-03 | Well Began Production |
2011-10-03 | Well Fluid changed to Crude Oil |
2011-10-03 | Well Mode changed to Pumping |
2014-04-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-13 | 1068.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-17 | Multi-Stage Fracture | 2908.00 | 2909.00 | 0 |
2011-09-19 | Multi-Stage Fracture | 2290.50 | 2291.50 | 0 |
2011-09-19 | Multi-Stage Fracture | 2219.70 | 2220.70 | 0 |
2011-09-19 | Multi-Stage Fracture | 2148.90 | 2149.90 | 0 |
2011-09-19 | Multi-Stage Fracture | 2078.10 | 2079.10 | 0 |
2011-09-19 | Multi-Stage Fracture | 2007.30 | 2008.30 | 0 |
2011-09-19 | Multi-Stage Fracture | 1936.50 | 1937.50 | 0 |
2011-09-19 | Multi-Stage Fracture | 1877.40 | 1878.40 | 0 |
2011-09-19 | Multi-Stage Fracture | 1793.70 | 1794.70 | 0 |
2011-09-19 | Multi-Stage Fracture | 1722.90 | 1723.90 | 0 |
2011-09-19 | Multi-Stage Fracture | 1652.10 | 1653.10 | 0 |
2011-09-18 | Multi-Stage Fracture | 2556.90 | 2557.90 | 0 |
2011-09-19 | Multi-Stage Fracture | 1581.40 | 1582.40 | 0 |
2014-04-14 | Acid Treatment | 2290.50 | 2291.50 | 0 |
2014-04-14 | Acid Treatment | 2219.70 | 2220.70 | 0 |
2014-04-14 | Acid Treatment | 2148.90 | 2149.90 | 0 |
2014-04-14 | Acid Treatment | 2078.10 | 2079.10 | 0 |
2014-04-14 | Acid Treatment | 2007.30 | 2008.30 | 0 |
2014-04-14 | Acid Treatment | 1936.50 | 1937.50 | 0 |
2014-04-14 | Acid Treatment | 1877.40 | 1878.40 | 0 |
2011-09-18 | Multi-Stage Fracture | 2786.10 | 2787.10 | 0 |
2011-09-18 | Multi-Stage Fracture | 2715.30 | 2716.30 | 0 |
2011-09-18 | Multi-Stage Fracture | 2644.50 | 2645.50 | 0 |
2011-09-18 | Multi-Stage Fracture | 2573.70 | 2574.70 | 0 |
2011-09-18 | Multi-Stage Fracture | 2502.90 | 2503.90 | 0 |
2011-09-18 | Multi-Stage Fracture | 2431.10 | 2432.10 | 0 |
2011-09-18 | Multi-Stage Fracture | 2361.40 | 2362.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1953 | 0.0 | 0.0 | 0.0 |
2012 | 8156 | 0.0 | 0.0 | 0.0 |
2013 | 8289 | 0.0 | 0.0 | 0.0 |
2014 | 8201 | 0.0 | 0.0 | 0.0 |
2015 | 7755 | 0.0 | 0.0 | 0.0 |
2016 | 8141 | 0.0 | 0.0 | 0.0 |
2017 | 8027 | 0.0 | 0.0 | 0.0 |
2018 | 8663 | 0.0 | 0.0 | 0.0 |
2019 | 8470 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-04-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]