If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875083315020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.579278,"lon":-115.206054,"icon":""}]} |
Location: 02/15-33-087-08W5/0 | |
Location Alias: 02/15-33-87-08 W5M | |
Location Alias 2: 02/15-33-087-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 08 | |
Section: 33 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: PPR REDEARTH 15-33-87-8 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0437230 | |
License Date: 2011-09-28 | |
License Status: Issued | |
Spud Date: 2011-10-16 | |
Final Drill Date: 2011-11-17 | |
Well Total Depth: 2898.00 m | |
Surface Hole Latitude: 56.579278 | |
Surface Hole Longitude: -115.206054 |
Date | Event |
---|---|
2011-09-28 | Obtained License |
2011-10-17 | Surface Casing Operation Performed |
2011-10-21 | Direction Drilling Operation Performed - Horizontal |
2011-11-03 | Intermediate Casing Operation Performed |
2011-11-15 | Liner Casing Operation Performed |
2011-11-17 | Finished Drilling |
2011-11-17 | Rig Released |
2011-11-17 | Well Mode changed to Drilled and Cased |
2011-11-20 | Well Log Performed |
2011-11-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-12-14 | Well Began Production |
2011-12-14 | Well Fluid changed to Crude Oil |
2011-12-14 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-21 | 1035.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-28 | Multi-Stage Fracture | 2833.90 | 2834.00 | 0 |
2011-11-29 | Multi-Stage Fracture | 2367.40 | 2367.50 | 0 |
2011-11-29 | Multi-Stage Fracture | 2307.40 | 2307.50 | 0 |
2011-11-29 | Multi-Stage Fracture | 2249.50 | 2249.60 | 0 |
2011-11-29 | Multi-Stage Fracture | 2200.50 | 2200.60 | 0 |
2011-11-29 | Multi-Stage Fracture | 2141.50 | 2141.60 | 0 |
2011-11-29 | Multi-Stage Fracture | 2083.50 | 2083.60 | 0 |
2011-11-29 | Multi-Stage Fracture | 2024.60 | 2024.70 | 0 |
2011-11-30 | Multi-Stage Fracture | 1969.60 | 1969.70 | 0 |
2011-11-30 | Multi-Stage Fracture | 1909.60 | 1909.70 | 0 |
2011-11-30 | Multi-Stage Fracture | 1845.60 | 1845.70 | 0 |
2011-11-28 | Multi-Stage Fracture | 2824.40 | 2824.50 | 0 |
2011-11-30 | Multi-Stage Fracture | 1796.20 | 1796.30 | 0 |
2011-11-30 | Multi-Stage Fracture | 1737.30 | 1737.40 | 0 |
2011-11-30 | Multi-Stage Fracture | 1682.50 | 1682.60 | 0 |
2011-11-30 | Multi-Stage Fracture | 1623.60 | 1623.70 | 0 |
2011-11-30 | Multi-Stage Fracture | 1568.40 | 1568.50 | 0 |
2011-11-30 | Multi-Stage Fracture | 1514.10 | 1514.20 | 0 |
2011-11-28 | Multi-Stage Fracture | 2765.90 | 2766.00 | 0 |
2011-11-28 | Multi-Stage Fracture | 2701.70 | 2701.80 | 0 |
2011-11-29 | Multi-Stage Fracture | 2648.10 | 2648.20 | 0 |
2011-11-29 | Multi-Stage Fracture | 2598.00 | 2598.10 | 0 |
2011-11-29 | Multi-Stage Fracture | 2538.50 | 2538.60 | 0 |
2011-11-29 | Multi-Stage Fracture | 2479.50 | 2479.60 | 0 |
2011-11-29 | Multi-Stage Fracture | 2426.80 | 2426.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 426 | 0.0 | 0.0 | 0.0 |
2012 | 8289 | 0.0 | 0.0 | 0.0 |
2013 | 8355 | 0.0 | 0.0 | 0.0 |
2014 | 8389 | 0.0 | 0.0 | 0.0 |
2015 | 8707 | 0.0 | 0.0 | 0.0 |
2016 | 8518 | 0.0 | 0.0 | 0.0 |
2017 | 8599 | 0.0 | 0.0 | 0.0 |
2018 | 7987 | 0.0 | 0.0 | 0.0 |
2019 | 8513 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[6]