If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0875101808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.543905,"lon":-115.5935,"icon":""}]} |
Location: 00/08-18-087-10W5/0 | |
Location Alias: 00/08-18-87-10 W5M | |
Location Alias 2: 00/08-18-087-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 5 | |
Range: 10 | |
Section: 18 | |
County/Municipality: Northern Sunrise County | |
Well Name: PPR EVI 8-18-87-10 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0449325 | |
License Date: 2012-10-18 | |
License Status: Issued | |
Spud Date: 2012-11-15 | |
Final Drill Date: 2012-11-25 | |
Well Total Depth: 2613.00 m | |
Surface Hole Latitude: 56.543905 | |
Surface Hole Longitude: -115.593500 |
Date | Event |
---|---|
2012-10-18 | Obtained License |
2012-11-16 | Surface Casing Operation Performed |
2012-11-22 | Direction Drilling Operation Performed - Horizontal |
2012-11-25 | Finished Drilling |
2012-11-25 | Well Mode changed to Drilled and Cased |
2012-11-26 | Production Casing Operation Performed |
2012-11-27 | Rig Released |
2012-12-02 | Well Log Performed |
2012-12-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-18 | Well Began Production |
2012-12-18 | Well Fluid changed to Crude Oil |
2012-12-18 | Well Mode changed to Pumping |
2014-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-11-15 | Bonanza Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-11-22 | 1559.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-12-06 | Multi-Stage Fracture | 2579.60 | 2579.70 | 0 |
2012-12-06 | Multi-Stage Fracture | 1923.20 | 1923.30 | 0 |
2012-12-06 | Multi-Stage Fracture | 1850.60 | 1850.70 | 0 |
2012-12-06 | Multi-Stage Fracture | 1786.70 | 1786.80 | 0 |
2012-12-06 | Multi-Stage Fracture | 1710.60 | 1710.70 | 0 |
2012-12-07 | Multi-Stage Fracture | 1638.10 | 1638.20 | 0 |
2012-12-07 | Multi-Stage Fracture | 1574.40 | 1574.50 | 0 |
2014-03-06 | Acid Treatment | 2579.60 | 2579.70 | 0 |
2014-03-06 | Acid Treatment | 2508.10 | 2508.20 | 0 |
2014-03-06 | Acid Treatment | 2422.90 | 2423.00 | 0 |
2014-03-06 | Acid Treatment | 2359.90 | 2360.00 | 0 |
2012-12-06 | Multi-Stage Fracture | 2508.10 | 2508.20 | 0 |
2014-03-06 | Acid Treatment | 2287.50 | 2287.60 | 0 |
2014-03-06 | Acid Treatment | 2215.20 | 2215.30 | 0 |
2014-03-06 | Acid Treatment | 2132.50 | 2132.60 | 0 |
2014-03-06 | Acid Treatment | 2069.00 | 2069.10 | 0 |
2014-03-06 | Acid Treatment | 1996.10 | 1996.20 | 0 |
2014-03-06 | Acid Treatment | 1923.20 | 1923.30 | 0 |
2014-03-06 | Acid Treatment | 1850.60 | 1850.70 | 0 |
2014-03-06 | Acid Treatment | 1786.70 | 1786.80 | 0 |
2014-03-06 | Acid Treatment | 1710.60 | 1710.70 | 0 |
2014-03-06 | Acid Treatment | 1638.10 | 1638.20 | 0 |
2012-12-06 | Multi-Stage Fracture | 2422.90 | 2423.00 | 0 |
2014-03-06 | Acid Treatment | 1574.40 | 1574.50 | 0 |
2012-12-06 | Multi-Stage Fracture | 2359.90 | 2360.00 | 0 |
2012-12-06 | Multi-Stage Fracture | 2287.50 | 2287.60 | 0 |
2012-12-06 | Multi-Stage Fracture | 2215.20 | 2215.30 | 0 |
2012-12-06 | Multi-Stage Fracture | 2132.50 | 2132.60 | 0 |
2012-12-06 | Multi-Stage Fracture | 2069.00 | 2069.10 | 0 |
2012-12-06 | Multi-Stage Fracture | 1996.10 | 1996.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 286 | 0.0 | 0.0 | 0.0 |
2013 | 6780 | 0.0 | 0.0 | 0.0 |
2014 | 6363 | 0.0 | 0.0 | 0.0 |
2015 | 7709 | 0.0 | 0.0 | 0.0 |
2016 | 7921 | 0.0 | 0.0 | 0.0 |
2017 | 8498 | 0.0 | 0.0 | 0.0 |
2018 | 8476 | 0.0 | 0.0 | 0.0 |
2019 | 7957 | 0.0 | 0.0 | 0.0 |
2020 | 777 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-12-07 | No Incident Encountered | 0.00 | 0.00 |
2014-03-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]