X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875112906000

Well Details

Well ID: 0875112906000
Loading map...
Location: 00/06-29-087-11W5/0
Location Alias: 00/06-29-87-11 W5M
Location Alias 2: 00/06-29-087-11 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 11
Section: 29
County/Municipality: Northern Sunrise County
Well Name: CDN FOREST EVI 6-29-87-11
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0434379
License Date: 2011-06-15
License Status: Issued
Spud Date: 2011-08-11
Final Drill Date: 2011-08-21
Well Total Depth: 2364.00 m
Surface Hole Latitude: 56.564232
Surface Hole Longitude: -115.722296

For data sources see[1][2]

Well History

Date Event
2011-06-15 Obtained License
2011-08-12 Surface Casing Operation Performed
2011-08-16 Direction Drilling Operation Performed - Deviate
2011-08-16 Well Log Performed
2011-08-17 Direction Drilling Operation Performed - Horizontal
2011-08-20 Well Log Performed
2011-08-21 Finished Drilling
2011-08-21 Well Log Performed
2011-08-21 Well Mode changed to Drilled and Cased
2011-08-23 Production Casing Operation Performed
2011-08-23 Rig Released
2011-08-31 Well Log Performed
2011-09-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2011-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-30 Well Began Production
2011-09-30 Well Fluid changed to Crude Oil
2011-09-30 Well Mode changed to Pumping
2018-02-21 Well Log Performed
2018-02-22 Well Log Performed
2018-03-15 Well Began Injection
2018-03-15 Well Fluid changed to Water
2018-03-15 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-16 1270.00 Deviate (5 - 79 degrees)
2011-08-17 1586.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-03 Hydra Jet Perforation 2321.00 2321.10 0
2011-09-03 Multi-Stage Fracture 2129.40 2129.90 0
2011-09-03 Multi-Stage Fracture 2183.40 2183.90 0
2011-09-03 Multi-Stage Fracture 2237.00 2237.50 0
2011-09-03 Multi-Stage Fracture 2291.60 2293.10 0
2011-09-03 Multi-Stage Fracture 1695.90 1696.40 0
2011-09-03 Multi-Stage Fracture 1750.20 1750.70 0
2011-09-03 Multi-Stage Fracture 1804.60 1805.10 0
2011-09-03 Multi-Stage Fracture 1859.00 1859.50 0
2011-09-03 Multi-Stage Fracture 1913.30 1913.80 0
2011-09-03 Multi-Stage Fracture 1967.80 1968.30 0
2011-09-03 Multi-Stage Fracture 2022.00 2022.50 0
2011-09-03 Multi-Stage Fracture 2075.90 2076.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2214 0.0 0.0 0.0
2012 8403 0.0 0.0 0.0
2013 8611 0.0 0.0 0.0
2014 8329 0.0 0.0 0.0
2015 8708 0.0 0.0 0.0
2016 8751 0.0 0.0 0.0
2017 8672 0.0 0.0 0.0
2018 1152 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References