X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875121503000

Well Details

Well ID: 0875121503000
Loading map...
Location: 00/03-15-087-12W5/0
Location Alias: 00/03-15-87-12 W5M
Location Alias 2: 00/03-15-087-12 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 12
Section: 15
County/Municipality: Northern Sunrise County
Well Name: SERENPET GEOG EVI 3-15-87-12
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0088755
License Date: 1981-02-03
License Status: RecCertified
Spud Date: 1981-02-11
Final Drill Date: 1981-02-25
Well Total Depth: 1582.00 m
Surface Hole Latitude: 56.540137
Surface Hole Longitude: -115.827445

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-02-03 Obtained License
1981-02-25 Finished Drilling
1981-02-25 Well Mode changed to Drilled and Cased
1981-02-27 Drill Stem Test Performed
1981-02-28 Drill Stem Test Performed
1981-03-01 Drill Stem Test Performed
1981-03-03 Production Casing Operation Performed
1981-03-14 Perforation Treatment Performed - Jet Perforation
1981-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-16 Perforation Treatment Performed - Jet Perforation
1981-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-19 Perforation Treatment Performed - Jet Perforation
1981-03-22 Perforation Treatment Performed - Cement Squeeze
1981-03-25 Perforation Treatment Performed - Cement Squeeze
1981-03-26 Perforation Treatment Performed - Jet Perforation
1981-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-24 Well Began Production
1981-06-24 Well Fluid changed to Crude Oil
1981-06-24 Well Mode changed to Pumping
1986-05-01 Well Fluid changed to Crude Oil
1986-05-01 Well Mode changed to Suspended
1986-06-01 Well Fluid changed to Crude Oil
1986-06-01 Well Mode changed to Pumping
1991-01-31 Well Fluid changed to Crude Oil
1991-01-31 Well Mode changed to Suspended
1994-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-19 Plug Back Performed
1994-09-19 Well Abandoned
1994-09-19 Well Fluid changed to Crude Oil
1994-09-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-14 Perforation 1549.30 1553.00 13
1981-03-26 Perforation 1500.50 1501.50 7
1981-03-27 Acid Treatment 1500.50 1501.50 0
1994-09-19 Packing Device Capped w/Cement 1477.00 1485.00 0
1981-03-14 Perforation 1544.50 1547.50 13
1981-03-15 Packing Device Capped w/Cement 1525.90 1535.00 0
1981-03-16 Perforation 1518.50 1524.00 13
1981-03-17 Acid Treatment 1518.50 1524.00 0
1981-03-19 Perforation 1500.00 1504.00 13
1981-03-19 Acid Treatment 1500.00 1504.00 0
1981-03-22 Cement Squeeze 1500.00 1504.00 0
1981-03-25 Cement Squeeze 1518.50 1524.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 4415 0.0 0.0 0.0
1982 7523 0.0 0.0 0.0
1983 7578 0.0 0.0 0.0
1984 8407 0.0 0.0 0.0
1985 7377 0.0 0.0 0.0
1986 6734 0.0 0.0 0.0
1987 8486 0.0 0.0 0.0
1988 8188 0.0 0.0 0.0
1989 7033 0.0 0.0 0.0
1990 8043 0.0 0.0 0.0
1991 615 0.0 0.0 0.0

For data sources see[5]

References