If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0876030206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.513075,"lon":-118.364094,"icon":""}]} |
Location: 00/06-02-087-03W6/0 | |
Location Alias: 00/06-02-87-03 W6M | |
Location Alias 2: 00/06-02-087-03 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 087 | |
Meridian: 6 | |
Range: 03 | |
Section: 02 | |
County/Municipality: Clear Hills County | |
Well Name: TOTAL ET AL WORSLEY 6-2-87-3 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0079626 | |
License Date: 1979-12-03 | |
License Status: RecCertified | |
Spud Date: 1979-12-06 | |
Final Drill Date: 1979-12-13 | |
Well Total Depth: 1116.00 m | |
Surface Hole Latitude: 56.513075 | |
Surface Hole Longitude: -118.364094 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-12-03 | Obtained License |
1979-12-09 | Drill Stem Test Performed |
1979-12-11 | Drill Stem Test Performed |
1979-12-13 | Finished Drilling |
1979-12-14 | Well Log Performed |
1979-12-15 | Drill Stem Test Performed |
1979-12-16 | Drill Stem Test Performed |
1979-12-17 | Drill Stem Test Performed |
1979-12-18 | Drill Stem Test Performed |
1979-12-19 | Drill Stem Test Performed |
1979-12-21 | Production Casing Operation Performed |
1979-12-21 | Well Mode changed to Drilled and Cased |
1980-02-04 | Perforation Treatment Performed - Jet Perforation |
1980-02-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-02-08 | Perforation Treatment Performed - Jet Perforation |
1980-02-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-02-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-02-15 | Well Abandoned |
1990-02-15 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-02-04 | Perforation | 1076.00 | 1078.00 | 13 |
1980-02-05 | Acid Treatment | 1076.00 | 1078.00 | 0 |
1980-02-08 | Packing Device Capped w/Cement | 1063.00 | 1070.00 | 0 |
1980-02-08 | Perforation | 1008.50 | 1011.00 | 7 |
1980-02-11 | Acid Treatment | 1008.50 | 1011.00 | 0 |
1980-02-15 | Packing Device Capped w/Cement | 997.00 | 1004.00 | 0 |
For data sources see[4]