X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0876093102020

Well Details

Well ID: 0876093102020
Loading map...
Location: 02/02-31-087-09W6/0
Location Alias: 02/02-31-87-09 W6M
Location Alias 2: 02/02-31-087-09 W6/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 6
Range: 09
Section: 31
County/Municipality: Clear Hills County
Well Name: BIRCHCLIFF 102 HZ WORSLEY 2-31-87-9
Operator Name: Enercapita Energy Ltd.
License Number: 0446375
License Date: 2012-06-08
License Status: Issued
Spud Date: 2012-07-08
Final Drill Date: 2012-07-18
Well Total Depth: 2600.00 m
Surface Hole Latitude: 56.593120
Surface Hole Longitude: -119.433171

For data sources see[1][2]

Well History

Date Event
2012-06-08 Obtained License
2012-07-09 Surface Casing Operation Performed
2012-07-11 Direction Drilling Operation Performed - Deviate
2012-07-12 Direction Drilling Operation Performed - Horizontal
2012-07-13 Intermediate Casing Operation Performed
2012-07-14 Well Log Performed
2012-07-18 Finished Drilling
2012-07-18 Well Mode changed to Drilled and Cased
2012-07-19 Liner Casing Operation Performed
2012-07-21 Rig Released
2012-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-29 Perforation Treatment Performed - Open-Hole Completion
2012-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-14 Well Began Production
2012-08-14 Well Fluid changed to Crude Oil
2012-08-14 Well Mode changed to Pumping
2020-01-31 Well Fluid changed to Crude Oil
2020-01-31 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-08 Excalibur Drilling Ltd. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-11 1036.40 Deviate (5 - 79 degrees)
2012-07-12 1352.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-29 Open Hole/Barefoot Completion 2590.00 2600.00 0
2012-07-30 Multi-Stage Fracture 1732.30 1733.10 0
2012-07-30 Multi-Stage Fracture 1660.00 1660.80 0
2012-07-30 Multi-Stage Fracture 1588.40 1589.20 0
2012-07-30 Multi-Stage Fracture 1530.20 1531.00 0
2012-07-30 Multi-Stage Fracture 1431.40 1432.20 0
2012-07-29 Multi-Stage Fracture 2531.10 2531.90 0
2012-07-29 Multi-Stage Fracture 2431.30 2432.10 0
2012-07-29 Multi-Stage Fracture 2332.70 2333.50 0
2012-07-29 Multi-Stage Fracture 2235.10 2235.90 0
2012-07-29 Multi-Stage Fracture 2124.50 2125.30 0
2012-07-29 Multi-Stage Fracture 2027.80 2028.60 0
2012-07-29 Multi-Stage Fracture 1929.50 1930.30 0
2012-07-30 Multi-Stage Fracture 1830.90 1831.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3092 0.0 0.0 0.0
2013 7106 0.0 0.0 0.0
2014 6970 0.0 0.0 0.0
2015 7400 0.0 0.0 0.0
2016 6017 0.0 0.0 0.0
2017 4183 0.0 0.0 0.0
2018 8503 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-21 No Incident Encountered 0.00 0.00
2012-08-08 No Incident Encountered 0.00 0.00

For data sources see[8]

References