X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0885080604000

Well Details

Well ID: 0885080604000
Loading map...
Location: 00/04-06-088-08W5/0
Location Alias: 00/04-06-88-08 W5M
Location Alias 2: 00/04-06-088-08 W5/00
Country: Canada
Province: Alberta
Township: 088
Meridian: 5
Range: 08
Section: 06
County/Municipality: Municipal District of Opportunity No. 17
Well Name: MBOG REDEARTH 4-6-88-8
Operator Name: Surge Energy Inc.
License Number: 0042086
License Date: 1972-02-11
License Status: Suspension
Spud Date: 1972-03-11
Final Drill Date: 1972-03-24
Well Total Depth: 1446.30 m
Surface Hole Latitude: 56.596884
Surface Hole Longitude: -115.273478

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-02-11 Obtained License
1972-03-24 Finished Drilling
1972-03-24 Well Mode changed to Drilled and Cased
1972-03-26 Drill Stem Test Performed
1972-03-27 Production Casing Operation Performed
1972-05-13 Perforation Treatment Performed - Jet Perforation
1972-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-15 Perforation Treatment Performed - Jet Perforation
1972-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-30 Well Began Production
1972-05-30 Well Fluid changed to Crude Oil
1972-05-30 Well Mode changed to Pumping
1998-03-07 Perforation Treatment Performed - Jet Perforation
1998-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-01 Well Fluid changed to Crude Oil
2002-06-01 Well Mode changed to Suspended
2013-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-05-13 Perforation 1435.60 1436.50 7
1972-05-14 Acid Treatment 1435.60 1436.50 0
1972-05-15 Perforation 1424.90 1428.60 7
1972-05-15 Perforation 1430.10 1431.30 7
1972-05-17 Acid Treatment 1424.90 1431.30 0
1998-03-07 Perforation 1298.20 1301.80 14
1998-03-08 Acid Treatment 1298.20 1301.80 0
2013-02-08 Packing Device Capped w/Cement 1406.70 1414.70 0
2013-02-09 Packing Device Capped w/Cement 1280.50 1288.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 4556 0.0 0.0 0.0
1973 7556 0.0 0.0 0.0
1974 8633 0.0 0.0 0.0
1975 8020 0.0 0.0 0.0
1976 7157 0.0 0.0 0.0
1977 7563 0.0 0.0 0.0
1978 7030 0.0 0.0 0.0
1979 8315 0.0 0.0 0.0
1980 8508 0.0 0.0 0.0
1981 7899 0.0 0.0 0.0
1982 8488 0.0 0.0 0.0
1983 8359 0.0 0.0 0.0
1984 8403 0.0 0.0 0.0
1985 8359 0.0 0.0 0.0
1986 7676 0.0 0.0 0.0
1987 8128 0.0 0.0 0.0
1988 8133 0.0 0.0 0.0
1989 8493 0.0 0.0 0.0
1990 8235 0.0 0.0 0.0
1991 7821 0.0 0.0 0.0
1992 8344 0.0 0.0 0.0
1993 7637 0.0 0.0 0.0
1994 7893 0.0 0.0 0.0
1995 8479 0.0 0.0 0.0
1996 8396 0.0 0.0 0.0
1997 8664 0.0 0.0 0.0
1998 8448 0.0 0.0 0.0
1999 8688 0.0 0.0 0.0
2000 8694 0.0 0.0 0.0
2001 8742 0.0 0.0 0.0
2002 408 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References