If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885121412020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.634245,"lon":-115.778512,"icon":""}]} |
Location: 02/12-14-088-12W5/0 | |
Location Alias: 02/12-14-88-12 W5M | |
Location Alias 2: 02/12-14-088-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 12 | |
Section: 14 | |
County/Municipality: Northern Sunrise County | |
Well Name: PPR 102 EVI 12-14-88-12 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0448829 | |
License Date: 2012-10-01 | |
License Status: Issued | |
Spud Date: 2012-10-30 | |
Final Drill Date: 2012-11-10 | |
Well Total Depth: 3154.00 m | |
Surface Hole Latitude: 56.634245 | |
Surface Hole Longitude: -115.778512 |
Date | Event |
---|---|
2012-10-01 | Obtained License |
2012-10-31 | Surface Casing Operation Performed |
2012-11-04 | Direction Drilling Operation Performed - Horizontal |
2012-11-10 | Finished Drilling |
2012-11-10 | Well Mode changed to Drilled and Cased |
2012-11-12 | Production Casing Operation Performed |
2012-11-13 | Rig Released |
2012-11-18 | Well Log Performed |
2012-11-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-08 | Well Began Production |
2012-12-08 | Well Fluid changed to Crude Oil |
2012-12-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-30 | Bonanza Drilling Inc. | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-11-04 | 1174.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-23 | Multi-Stage Fracture | 3140.00 | 3140.10 | 0 |
2012-11-24 | Multi-Stage Fracture | 2511.60 | 2511.70 | 0 |
2012-11-24 | Multi-Stage Fracture | 2440.90 | 2441.00 | 0 |
2012-11-24 | Multi-Stage Fracture | 2298.60 | 2298.70 | 0 |
2012-11-24 | Multi-Stage Fracture | 2227.70 | 2227.80 | 0 |
2012-11-24 | Multi-Stage Fracture | 2156.70 | 2156.80 | 0 |
2012-11-24 | Multi-Stage Fracture | 2086.00 | 2086.10 | 0 |
2012-11-24 | Multi-Stage Fracture | 2020.40 | 2020.50 | 0 |
2012-11-25 | Multi-Stage Fracture | 1950.00 | 1950.10 | 0 |
2012-11-25 | Multi-Stage Fracture | 1880.00 | 1880.10 | 0 |
2012-11-25 | Multi-Stage Fracture | 1806.90 | 1807.00 | 0 |
2012-11-23 | Multi-Stage Fracture | 3069.20 | 3069.30 | 0 |
2012-11-23 | Multi-Stage Fracture | 2998.30 | 2998.40 | 0 |
2012-11-23 | Multi-Stage Fracture | 2927.30 | 2927.40 | 0 |
2012-11-23 | Multi-Stage Fracture | 2856.60 | 2856.70 | 0 |
2012-11-24 | Multi-Stage Fracture | 2785.70 | 2785.80 | 0 |
2012-11-24 | Multi-Stage Fracture | 2715.00 | 2715.10 | 0 |
2012-11-24 | Multi-Stage Fracture | 2644.10 | 2644.20 | 0 |
2012-11-24 | Multi-Stage Fracture | 2582.30 | 2582.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 546 | 0.0 | 0.0 | 0.0 |
2013 | 7215 | 0.0 | 0.0 | 0.0 |
2014 | 2278 | 0.0 | 0.0 | 0.0 |
2015 | 4775 | 0.0 | 0.0 | 0.0 |
2016 | 8054 | 0.0 | 0.0 | 0.0 |
2017 | 7690 | 0.0 | 0.0 | 0.0 |
2018 | 8296 | 0.0 | 0.0 | 0.0 |
2019 | 3966 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]