If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885122815000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.660885,"lon":-115.846097,"icon":""}]} |
Location: 00/15-28-088-12W5/0 | |
Location Alias: 00/15-28-88-12 W5M | |
Location Alias 2: 00/15-28-088-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 12 | |
Section: 28 | |
County/Municipality: Northern Sunrise County | |
Well Name: LONE PINE OTTER 15-28-88-12 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0440655 | |
License Date: 2011-12-08 | |
License Status: Suspension | |
Spud Date: 2012-01-26 | |
Final Drill Date: 2012-02-05 | |
Well Total Depth: 2216.00 m | |
Surface Hole Latitude: 56.660885 | |
Surface Hole Longitude: -115.846097 |
Date | Event |
---|---|
2011-12-08 | Obtained License |
2012-01-27 | Surface Casing Operation Performed |
2012-01-30 | Direction Drilling Operation Performed - Deviate |
2012-02-02 | Direction Drilling Operation Performed - Horizontal |
2012-02-05 | Finished Drilling |
2012-02-05 | Production Casing Operation Performed |
2012-02-05 | Rig Released |
2012-02-05 | Well Mode changed to Drilled and Cased |
2012-02-10 | Well Log Performed |
2012-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-22 | Perforation Treatment Performed - Jet Perforation |
2012-02-22 | Well Log Performed |
2012-02-23 | Perforation Treatment Performed - Remedial Casing |
2012-02-25 | Perforation Treatment Performed - Jet Perforation |
2012-02-25 | Well Log Performed |
2012-02-26 | Perforation Treatment Performed - Remedial Casing |
2012-03-03 | Well Log Performed |
2012-03-04 | Well Log Performed |
2012-05-01 | Well Began Production |
2012-05-01 | Well Fluid changed to Crude Oil |
2012-05-01 | Well Mode changed to Pumping |
2018-03-11 | Well Fluid changed to Crude Oil |
2018-03-11 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-25 | Precision Drilling Corporation | 373 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-30 | 1360.00 | Deviate (5 - 79 degrees) |
2012-02-02 | 1715.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-14 | Multi-Stage Fracture | 1771.00 | 1771.50 | 0 |
2012-02-22 | Perforation | 381.00 | 383.00 | 17 |
2012-02-23 | Remedial Casing Cementing | 381.00 | 383.00 | 0 |
2012-02-25 | Perforation | 352.00 | 353.00 | 17 |
2012-02-26 | Remedial Casing Cementing | 352.00 | 353.00 | 0 |
2012-02-14 | Multi-Stage Fracture | 1828.20 | 1828.70 | 0 |
2012-02-14 | Multi-Stage Fracture | 1880.90 | 1881.40 | 0 |
2012-02-14 | Multi-Stage Fracture | 1930.20 | 1930.70 | 0 |
2012-02-14 | Multi-Stage Fracture | 1979.20 | 1979.70 | 0 |
2012-02-14 | Multi-Stage Fracture | 2027.80 | 2028.30 | 0 |
2012-02-14 | Multi-Stage Fracture | 2077.20 | 2077.70 | 0 |
2012-02-14 | Multi-Stage Fracture | 2127.20 | 2127.70 | 0 |
2012-02-14 | Multi-Stage Fracture | 2176.60 | 2177.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5544 | 0.0 | 0.0 | 0.0 |
2013 | 8441 | 0.0 | 0.0 | 0.0 |
2014 | 8636 | 0.0 | 0.0 | 0.0 |
2015 | 8460 | 0.0 | 0.0 | 0.0 |
2016 | 8459 | 0.0 | 0.0 | 0.0 |
2017 | 648 | 0.0 | 0.0 | 0.0 |
For data sources see[7]