X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0895033205000

Well Details

Well ID: 0895033205000
Loading map...
Location: 00/05-32-089-03W5/0
Location Alias: 00/05-32-89-03 W5M
Location Alias 2: 00/05-32-089-03 W5/00
Country: Canada
Province: Alberta
Township: 089
Meridian: 5
Range: 03
Section: 32
County/Municipality: Municipal District of Opportunity No. 17
Well Name: SUMMERLAND TROUT 5-32-89-3
Operator Name: Summerland Energy Inc.
License Number: 0132018
License Date: 1988-02-08
License Status: Abandoned
Spud Date: 1988-02-11
Final Drill Date: 1988-02-29
Well Total Depth: 1480.00 m
Surface Hole Latitude: 56.761679
Surface Hole Longitude: -114.448088

For data sources see[1][2]

Well History

Date Event
1988-02-08 Obtained License
1988-02-14 Lost Circulation Occurred
1988-02-20 Surface Casing Operation Performed
1988-02-24 Intermediate Casing Operation Performed
1988-02-28 Lost Circulation Occurred
1988-02-29 Finished Drilling
1988-02-29 Well Log Performed
1988-02-29 Well Mode changed to Drilled and Cased
1988-03-01 Well Log Performed
1988-03-02 Production Casing Operation Performed
1988-03-02 Rig Released
1988-03-10 Well Log Performed
1988-03-18 Perforation Treatment Performed - Jet Perforation
1988-03-18 Well Log Performed
1988-03-22 Perforation Treatment Performed - Jet Perforation
1988-03-22 Well Log Performed
1988-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-25 Perforation Treatment Performed - Cement Squeeze
1988-03-29 Perforation Treatment Performed - Cement Squeeze
1988-03-29 Well Log Performed
1988-04-01 Perforation Treatment Performed - Jet Perforation
1988-04-01 Well Log Performed
1988-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-14 Well Log Performed
1988-07-18 Perforation Treatment Performed - Cement Squeeze
1988-07-20 Well Log Performed
1988-07-21 Perforation Treatment Performed - Jet Perforation
1988-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-01 Well Began Production
1988-08-01 Well Fluid changed to Crude Oil
1988-08-01 Well Mode changed to Pumping
1989-06-11 Perforation Treatment Performed - Chemical Squeeze
1990-10-04 Perforation Treatment Performed - Jet Perforation
1990-10-04 Well Log Performed
1990-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-25 Well Log Performed
1991-07-26 Perforation Treatment Performed - Jet Perforation
1991-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Suspended
2001-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-09 Plug Back Performed
2001-12-09 Well Fluid changed to Crude Oil
2001-12-09 Well Mode changed to Abandoned Zone
2001-12-10 Perforation Treatment Performed - Jet Perforation
2001-12-11 Perforation Treatment Performed - Remedial Casing
2001-12-15 Well Abandoned
2001-12-15 Well Fluid changed to Crude Oil
2001-12-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-18 Perforation 1448.20 1453.50 13
1988-07-18 Cement Squeeze 1441.50 1444.60 0
1988-07-21 Perforation 1436.40 1437.50 7
1988-07-22 Acid Treatment 1436.40 1440.30 0
1989-06-11 Chemical Squeeze 1436.40 1440.30 0
1990-10-04 Perforation 1442.00 1444.00 13
1990-10-06 Acid Treatment 1442.00 1444.00 0
1990-10-07 Acid Treatment 1442.00 1444.00 0
1991-07-26 Perforation 1432.00 1433.50 7
1991-07-27 Acid Treatment 1432.00 1433.50 0
1991-07-28 Acid Treatment 1432.00 1433.50 0
1988-03-22 Perforation 1438.40 1440.30 13
2001-12-09 Packing Device Capped w/Cement 1425.00 1425.50 0
2001-12-10 Perforation 580.00 581.00 14
2001-12-11 Remedial Casing Cementing 580.00 581.00 0
1988-03-22 Perforation 1441.50 1444.60 13
1988-03-23 Acid Treatment 1438.40 1444.60 0
1988-03-25 Cement Squeeze 1448.20 1453.50 0
1988-03-29 Cement Squeeze 1438.40 1444.60 0
1988-04-01 Perforation 1436.40 1437.50 13
1988-04-01 Perforation 1438.40 1440.30 13
1988-04-02 Acid Treatment 1436.40 1440.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 3353 0.0 0.0 0.0
1989 8275 0.0 0.0 0.0
1990 7327 0.0 0.0 0.0
1991 6089 0.0 0.0 0.0
1992 3333 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-02-14 Lost Circulation 584.00 584.00
1988-02-28 Lost Circulation 1449.00 1480.00

For data sources see[6]

References